Suzuki GRAND VITARA 2005 Service Manual page 223

Hide thumbs Also See for GRAND VITARA 2005:
Table of Contents
10) Install main bearing caps in proper position mating
cylinder number marked in removal.
11) Tighten new main bearing cap bolts as follows.
a) Tighten main bearing cap bolts to 20 N⋅m (2.0
kgf-m, 14.5 lb-ft) according to numerical order
("1" through "10") as shown in figure.
b) Retighten them by turning through 62° in the
same manner as step a).
NOTE
After tightening bearing cap bolts, check to
be sure that crankshaft rotates smoothly.
Tightening torque
Crankshaft main bearing cap bolt (a):
Tighten 20 N⋅m (2.0 kgf-m, 14.5 lb-ft) and 62°
by the specified procedure
12) Cut excess bearing cap seal that protrudes from
main bearing cap No.1.
13) Using special tool, install flywheel side crankshaft oil
seal as follows.
Special tool
(A): 09911–96530
a) Fit new oil seal (1) to special tool.
b) Install oil seal tapping special tool with a plastic
hammer.
14) Install piston and connecting rod referring to "Piston,
Piston Ring and Connecting Rod Removal and
Installation: ".
15) Install cylinder head referring to "Valve and Cylinder
Head Assembly Removal and Installation: ".
16) Install heat exchanger with new gasket referring to
I5JB0B140129-01
"Heat Exchanger Removal and Installation: in
Section 1E", if removed.
17) Install oil pump, oil pump drive sprocket, oil pump
chain and gasket holder plate referring to "Oil Pump,
Oil Pump Chain and Gasket Holder Plate Removal
and Installation: in Section 1E".
18) Install oil pan and oil pump strainer referring to "Oil
Pan and Oil Pump Strainer Removal and Installation:
in Section 1E".
19) Install timing belt referring to "Timing Belt and Belt
Tensioner Removal and Installation: ".
20) Install engine assembly to vehicle referring to
"Engine Assembly Removal and Installation: ".
Engine Mechanical:
1D-60
I5JB0B140130-01
Table of Contents
loading

Table of Contents