Suzuki GRAND VITARA 2005 Service Manual page 177

Hide thumbs Also See for GRAND VITARA 2005:
Table of Contents
Installation
1) Confirm that special tool (A) is inserted into TDC pin
hole.
If special tool (A) is removed, insert special tool (A)
referring to Step 5) of "Installation" under "Piston,
Piston Ring and Connecting Rod Removal and
Installation: ".
Special tool
(A): 09912–46510
2) Check crankshaft groove (1) is located in middle of
two ribs (2) on gasket holder plate.
3) Check mark (1) of camshaft pulley (2) is aligned with
mark (3) of timing belt inner cover (4).
4) Install crankshaft timing belt pulley (1), if removed.
5) Install timing belt tensioner plate (2), if removed.
Tightening torque
Timing belt tensioner plate bolt (a): 10 N·m (1.0
kgf-m, 7.5 lb-ft)
6) Install timing belt tensioner pulley (3) with positioning
hole (4) to pin (5) of timing belt tensioner plate, and
tighten timing belt tensioner pulley nut by hand
temporarily.
I5JB0B140024-01
7) Install timing belt (1) with aligning its matching lines
(2) with matching marks (3) of camshaft pulley (4),
injection pump pulley (5) and crankshaft timing belt
pulley (6).
NOTE
Be sure to direct arrow mark (7) of timing belt
clockwise as shown in figure.
I5JB0B140030-01
I5JB0B140031-01
Engine Mechanical:
2
3
4
1
3
2
1D-14
I5JB0B140032-01
7
3
2
5
6
I5JB0B140029-01
Table of Contents
loading

Table of Contents