Page 1
2010-2011 Yamaha Vector USB cable cd-rom Snowmobile installation guide power commander decals Installation Instructions dynojet decals velcro strip alcohol swab The ignition MUST be turned OFF before installation! OWNLOAD THE OWER OMMANDER SOFTWARE AND LATEST MAPS FROM OUR WEBSITE...
Crank - 3. Push the wire into the hole of the PCV until it instructed to do so by Dynojet. It is used to stops and then tighten the screw. transfer crank trigger data from one module to 4.
Page 3
The ignition must be turned OFF before installation. Loosen the cam screws located near the headlight/windshield assembly as shown in Figure A. Remove the front body panel. cam screw cam screw Remove the right and left side body panels by loosening the cam screws as shown in Figure B.
Page 4
With the headlight/windshield assembly moved forward, unplug the two connectors on the gauge harness. This will allow you to completely remove the headlight/windshield assembly. unplug connectors Remove the headlight/windshield assembly. Remove the four bolts securing the upper frame brace. Only two bolts are visible in Figure E.
Page 5
11 Disconnect the two hoses on the MAG side of the airbox as shown in Figure G. 12 Disconnect the sensor connector on the PTO side of the airbox as shown in Figure G. 13 Using a ball head allen wrench, loosen the three clamps securing the airbox to the throttle bodies.
Page 6
21 Using the supplied velcro, secure the PCV to the clutch cover as shown in Figure J. Make sure to clean both surfaces with the alcohol swab before attaching. attach ring lug 22 Bolt the ring lug to the frame when the upper frame brace is replaced. 23 Replace the airbox.
Page 7
If you are looking for a display for your setup we have the answer. Dynojet’s LCD-200 is a color touch screen display capable of displaying all PC data and AFR if you are using the Wideband 2.