Sub woofer installation procedure
Follow these steps to install the Sub woofer:
1.) Place the Sub woofer in position at the base of the chassis.
2.) Install the six (6x) hex key screws securing the Sub woofer to the chassis.
3.) Replace the BEP.
8-8-8-4
Verification
Perform the following steps to verify that the product is functioning as intended after this replacement:
1.) Power up the VIVID E9 / VIVID E7.
2.) Turn the volume control on at the OP Panel.
3.) Select PW mode and press on the selected probe to ensure the sub woofer produces sound.