GE Vivid E9 Service Manual page 426

With xdclear
Hide thumbs Also See for Vivid E9:
Table of Contents
GE
D
GB091046, R
IRECTION
8-6-15
Replacing the Operator Panel, Lower
DO NOT TOUCH ANY BOARDS WITH INTEGRATED CIRCUITS PRIOR TO TAKING THE
WARNING
WARNING
NECESSARY ESD PRECAUTIONS.
1. ALWAYS CONNECT YOURSELF, VIA AN ARM-WRIST STRAP, TO THE ADVISED
ESD CONNECTION POINT LOCATED ON THE REAR OF THE SCANNER (NEAR THE
POWER CONNECTOR).
2. FOLLOW GENERAL GUIDELINES FOR HANDLING OF ELECTROSTATIC SENSITIVE
EQUIPMENT.
8-6-15-1
Read and Follow
ENERGY CONTROL AND POWER LOCKOUT FOR VIVID E9 / VIVID E7.
WARNING
WARNING
WHEN SERVICING PARTS OF THE SYSTEM WHERE THERE IS EXPOSURE TO
VOLTAGE GREATER THAN 30 VOLTS:
1. FOLLOW LOCK OUT/TAG OUT PROCEDURES.
TAG
&
LOCKOUT
2. TURN OFF THE BREAKER.
Signed
Date
3. UNPLUG THE VIVID E9 / VIVID E7.
4. MAINTAIN CONTROL OF THE POWER PLUG.
5. WAIT FOR AT LEAST 20 SECONDS FOR CAPACITORS TO DISCHARGE, AS THERE ARE NO TEST POINTS TO
VERIFY ISOLATION. THE AMBER LIGHT ON THE OP PANEL ON/OFF BUTTON WILL TURN OFF.
BEWARE THAT THE MAIN POWER SUPPLY AND BACK END PROCESSOR MAY BE ENERGIZED EVEN IF THE POWER
IS TURNED OFF WHEN THE CORD IS STILL PLUGGED INTO THE AC OUTLET.
8-6-15-2
Preparations
When preparing for the replacement, you must perform the following steps:
1.) Power down the VIVID E9 / VIVID E7
2.) Disconnect the Mains Power Cable from the wall outlet.
3.) Disconnect all probes and external I/O cabling.
4.) Remove Operator Panel, Upper.
8 - 110
2
EVISION
Section 8-6 - Top Console Parts Replacement Overview
VIVID E9 / VIVID E7 BT'13 S
M
ERVICE
ANUAL

Hide quick links:

Table of Contents
loading

This manual is also suitable for:

Vivid e7Vividte7

Table of Contents