Dimensioned Drawings, Drilling Dimensions For The Pm250 Power Module - Siemens SINAMICS G120 Operating Instructions Manual

Low voltage inverters built-in units with cu250s-2 control units and encoder evaluation
Hide thumbs Also See for SINAMICS G120:
Table of Contents
4.3.4

Dimensioned drawings, drilling dimensions for the PM250 Power Module

The following dimension drawings and drilling patterns are not to scale.
Frame size FSC
Table 4-11
Frame
size
FSC
BOP-2, IOP-2 or blanking cover
1)
Table 4-12
Frame
size
FSC
You can mount the Power Modules without any lateral cooling air clearance. For tolerance reasons,
1)
we recommend a lateral clearance of approx. 1 mm.
Converter with the CU250S-2 Control Units
Operating Instructions, 04/2018, FW V4.7 SP10, A5E31759476B AG
Dimensions depend on the operator panel (OP) that is inserted
Mounting depth in the cabinet with Control Unit (CU) [mm]
without OP
227
Cooling air clearances and fastening
Cooling air clearances [mm]
Top
Bottom
125
125
4.3 Installing Power Modules
Fixing/torque [Nm]
1)
Front
65
Installing
with OP
1)
238
4 x M5 / 3
69
Table of Contents
loading

Table of Contents