Operation Flow - Panasonic LP-GS Series Setup & Maintenance Manual

Laser marker
Hide thumbs Also See for LP-GS Series:
Table of Contents

6-1-2 Operation flow

„ Example of operations for Position correction → Marking → Code checking
Start the image checker and laser marker
Start up and online connect the Laser Marker NAVI smart
Check the marking ready output ON
Image checker: Operation start
• Execution of shooting and checker
• Output of inspection results
Laser marker: Change of coordinates
Laser marker: Laser radiation
Code reader: Operation start
• Reading and checkup of the marked code
• Output of checkup results
Laser marker: Output of checkup results
* If it is set to use the TIMING IN signal, enter TIMING IN as a next operation trigger.
• Confirm the laser marker and image checker communication settings in advance.
• Set the conditions of files to use the image checker linkage function.
• The image checker linkage function can be used while the laser marker is under the remote control mode.
Remote mode ON
Select File
Laser pumping ON
Shutter open
Laser marker marking trigger input
TIMING IN signal input *
TIMING IN signal input *
ME-LPGS-SM-8
Repeat this procedure
119

Hide quick links:

Table of Contents

Troubleshooting

loading

Table of Contents