Dynojet Power Commander V Installation Instructions

Dynojet Power Commander V Installation Instructions

2018 kawasaki z900rs

Quick Links

2018 Kawasaki Z900RS
I n s t a l l a t i o n I n s t r u c t i o n s
PLEASE READ ALL DIRECTIONS BEFORE STARTING INSTALLATION
17-075
www.powercommander.com
2191 Mendenhall Drive North Las Vegas, NV 89081 (800) 992-4993 www.powercommander.com
PARTS LIST
1
Power Commander
1
USB Cable
1
Installation Guide
2
Power Commander Decals
2
Dynojet Decals
2
Velcro strips
1
Alcohol swab
THE IGNITION MUST BE TURNED
OFF BEFORE INSTALLATION!
THE LATEST POWER COMMANDER
SOFTWARE AND MAP FILES CAN BE
DOWNLOADED FROM OUR WEB SITE AT:
www.powercommander.com
2018 Kawasaki Z900RS - PCV - 1
loading

Summary of Contents for Dynojet Power Commander V

  • Page 1 2018 Kawasaki Z900RS Installation Guide Power Commander Decals I n s t a l l a t i o n I n s t r u c t i o n s Dynojet Decals Velcro strips Alcohol swab THE IGNITION MUST BE TURNED OFF BEFORE INSTALLATION!
  • Page 2: Usb Connection

    POWER COMMANDER V INPUT ACCESSORY GUIDE ACCESSORY INPUTS Map - (Input 1 or 2) The PCV has the ability to hold 2 different base maps. You can switch on the fly between these two base maps when you hook up a switch to the MAP inputs. You can USB CONNECTION use any open/close type switch. The polarity of the wires is not important. When using the Autotune kit one position will hold a base map and the other position will let you activate the learning mode. When the switch is “CLOSED” Autotune will be activated. (Set to Switch Input #1 by default.) Shifter- (Input 1 or 2) These inputs are for use with the Dynojet quickshifter. Insert the wires from the CRANK Dynojet quickshifter into the SHIFTER inputs. ANALOG The polarity of the wires is not important. (Set to Switch Input #2 by default.) SPEED EXPANSION PORTS 1 & 2 INPUT 2 (Grnd)
  • Page 3 FIG.A Remove the seat, the right and left side body panels and the fuel tank (Fig. A). FIG.B Install the PCV in the tail section near the ECU (Fig. B). The PCV can be secured in place using the supplied velcro if desired. Route the PCV wiring harness forward towards the engine following inside the left frame rail. FIG.C Secure the PCV ground wire with the small ring lug to the common ground location on the left side of the engine (Fig. C). This location is just above the sprocket cover 17-075 www.powercommander.com 2018 Kawasaki Z900RS - PCV - 3...
  • Page 4 FIG.D Unplug the stock wiring harness from each of the four injectors (Fig. D). Plug the PCV wiring harness in-line of each injector and the stock wiring FIG.E harness (Fig. E). The pair of PCV leads with ORANGE colored wires go in-line of the Cylinder #1 (left most) injector. The pair of PCV leads with YELLOW colored wires go in-line of the Cylinder #2 injector. The pair of PCV leads with GREEN colored wires go in-line of the Cylinder #3 injector.
  • Page 5: Optional Inputs

    FIG.G Plug the pair of 3-pin connectors on the PCV wiring harness in-line of the Lower Primary Throttle Position Sensor and the stock wiring harness (Fig. G). 10 Reinstall the fuel tank, body work, and seat. Optional inputs: Gear - GREEN/RED wire of sensor on left side of engine near shift shaft Engine temp - GREEN/WHITE wire located on back of cylinder between #3 & #4 12v source for Auto-tune - RED wire on tail/tag light connector 17-075 www.powercommander.com 2018 Kawasaki Z900RS - PCV - 5...