Bosch CL550 Configuration And Commissioning Software Manual page 97

Hide thumbs Also See for CL550:
Table of Contents
Frontside, 2–2, 2–3, 2–6, 2–22
Functional mode, 2–10, 2–18
Functionality, 2–10
Bus master, 2–10
Busmaster PROFIBUS–DP/V1, 2–2
DP bus master, 2–12
DP/V1–COM, 2–10, 2–15
INTERBUS–S, 2–10, 2–17
PLC, 2–2, 2–10, 2–11
Power supply, 2–16
TCP/IP communication, 2–2
TCP/IP–COM, 2–10, 2–14
V.24–COM, 2–10
V24–COM, 2–10
G
Gateway, 3–23
GG4–9 mounting rack, 3–8
H
Hard disk drive, 1–7
Hub, 4–15, 4–16
I
IEEE 802, 2–3
Input, 2–4, 2–12
Intended use, 1–1
Interface
Ethernet, 2–6, 2–15, 3–8, 3–16, 4–5, 4–6, 4–9, 4–10,
4–14, 4–15, 4–16, 4–17, 4–20, 4–21
PROFIBUS, 2–16
select, 4–23
serial, 2–6, 2–10, 2–18
Interfacing, decentralized, 2–2
IP address, 2–7, 2–21, 3–8, 3–12, 3–14, 3–17, 4–26
Assignment, for selected elements, 3–27
Check and set, 3–16
IP address range, Determine, 3–26
IP addresses, 4–2
L
LAN, 2–3, 3–7
Loading procedure, 3–17
Low–Voltage Directive, 1–1
M
Manufacturing system, 3–3, 3–8
Manufacturing System ID, 3–4
Master, 2–4
Measuring or testing procedures, 1–5
Menu item, Select, 2–19
Merge configuration files, 3–21
Mode, Select, 2–18
Multiple processor system, 4–11
via CON550, 4–1
via ZS550, 4–1
Multiprocessor system, 2–1
N
Network, 3–18
Network PC, 4–16, 4–17, 4–21
1070 072 262-101 (01.09) GB
NT4, 2–16
O
Operating elements, 2–7, 2–8, 2–9
CON550, 2–20
Output, 2–4, 2–12, 2–18
P
Patch cable, 4–9, 4–10, 4–15, 4–16, 4–17, 4–21
PE, 4–1
Peripherals, decentralized, 2–4, 2–7, 4–22
PLC language, 2–3
ANSI "C", 2–3
Function diagram, 2–3
Instructions list, 2–3
Ladder diagram, 2–3
Sequential function chart, 2–3
Structured text, 2–3
PLC program
load, 4–26
open, 4–25
PLC utility program, 2–12
Power supply, 2–10, 2–16
Power supply module, 2–1
Display, 2–16
Power supply unit, 2–3
Prerequisites, Commissioning, 4–1
Presetting
Communication channel, 4–8, 4–13, 4–19
Rack_ID, 4–3, 4–7, 4–12, 4–18
Subnetwork mask, 4–2
TCP/IP addresses, 4–2
PROFIBUS–DP, 2–2, 2–3, 2–4, 4–1, 4–22
Programming, 2–3
central, 4–26
Programming device, 4–5, 4–9, 4–15, 4–20
Project, open, 4–22
Project configurator, 3–1, 4–1
Main window, 3–7
Project directory, 3–3
Project settings, 4–25
WinSPS, 3–6
Q
Qualified personnel, 1–2
R
Rack, 3–3, 3–4
Rack ID, 2–7, 2–20, 3–5
Rack_ID, 3–8, 3–12, 3–13, 3–14, 4–3, 4–12, 4–18
Rack_Slot_ID, 3–5, 3–12, 3–13
Remanence error, 2–11, 2–18
Rotary switch, 2–20, 3–5, 4–3, 4–7, 4–12, 4–18
Router, 2–24, 3–23
S
Safety instructions, 1–4
Selector switch
"Cross" position, 4–9, 4–20
"Patch" position, 4–10, 4–21
Setting, TCP/IP address, 4–4, 4–7, 4–12, 4–18
Appendix
A–3
Table of Contents
loading

Table of Contents