Section 7
IEC 61850 communication engineering
7.5
108
1.
Create a project in IET600.
2.
Import the SCD file created by PCM600.
3.
Do vertical communication engineering (monitoring direction).
3.1. Check the default data sets.
3.2. Configure and/or re-configure the default data sets.
3.3. Configure additional Report Control Blocks when needed for each data set
used for vertical communication.
3.4. Link the IED clients to the Report Control Blocks.
4.
Do horizontal communication engineering.
4.1. Configure GOOSE control blocks for each data set configured for GOOSE
messages.
5.
Update the data flow.
6.
Export the updated SCD file.
All data sets, all Report Control Blocks and GOOSE control block
must be located at LD0 / LLN0.
Importing SCL files to PCM600
The IED engineering tool must be able to receive a SCD file or an ICD file as an import
to receive the engineered communication extensions, for example, for the different
IEDs.
Note that reporting data sets shall only contain data
intended to be used by clients, for example for event
handling.
The data set for GOOSE may contain signals on data
attribute level or on FCDA level. The latter is also called
structured GOOSE.
Up to five report clients can be configured.
Note that one data may be included in a GOOSE data set
only once.