Commissioning; Security; Commissioning Steps; General Information - Bosch Rexroth ctrlX CORE X7 Operating Instructions Manual

Table of Contents
34 / 50

Safe decommissioning

Note the wire specifications when connecting the shielding
Shield the closest possible to the signal terminal points
Route all power cables and data cables in separate cable channels.
11

Commissioning

11.1
IT security
Operating systems and machines require the implementation of a comprehensive concept for state-of-
the-art IT security. Bosch Rexroth products are part of an overall concept. The properties of the Bosch
Rexroth products have to be considered for a comprehensive IT security concept. For the required
properties, refer to the IT Security Guideline
11.2

Commissioning steps

11.2.1 General information

To commission the device, proceed as follows:
1.
Mount the control.
For details, refer to
2.
Connect the voltage supply to the XD10 connection of the control.
Refer to
⮫ Chapter 10.5.2 "Power connector XD10 " on page
11.3
Safe decommissioning

11.3.1 Notes on safe decommissioning

To securely decommission the ctrlX CORE control with regard to IT security, delete all user data on the
control. There are two options to delete user data:
1.
Deleting configurations and apps
First, delete all configurations created on the control and then all installed apps. All user data
belonging to the apps is also deleted.
2.
Loading a new image to the control using an SD card
An SD card can be used to load an image to the control. All existing data is deleted when loading
a new image. Please contact the Bosch Rexroth Service.
Please back up the user data before you delete it if you want to restore it on another control.
Bosch Rexroth AG
(⮫
R911342562).
⮫ Chapter 10.2 "Installation notes" on page
ctrlX CORE X7
24.
30.
R911419122, Edition 01
Table of Contents
loading

Table of Contents