Break-in Operation for New Machine
IMPORTANT: If the machine is heavily loaded without
performing the break-in operation, damage to the
machine such as seizure and/or scoring may result and
the machine life will be significantly shortened. Be
sure to sufficiently perform break-in operation.
Machine life and performance will be greatly affected by the
extent of operation and maintenance of the machine during
the initial operation. Perform break-in operation for the first
100 hours.
Check the machine before starting the engine.
After starting the engine, sufficiently perform warm up
operation.
Avoid sudden starting, sudden acceleration and sudden
braking while traveling the machine.
Avoid heavy load for the front attachment.
BREAK-IN
2-1