Verification
–
Vivid E80/E90/E95
GC091052 Rev. 3
Lower Operating Panel Parts replacement
to the front and 2 pc. M4 x 12 at the rear). The screws are
entered from below the Operating Panel tray.
5. Install the Operating Panel, Upper.
Perform the following steps to verify that the product is
functioning as intended after this Operating Panel replacement:
1. Verify that all screws that you removed earlier has been
installed.
2. If finished, connect cables and probes you removed earlier.
3. Verify that the Alphanumeric Keyboard assembly can be
moved as intended and that it locks in its inner position.
Service Manual
8-41