1 Press the back button.
Result: A graph is displayed, highlighting the current
step of the screed dryout schedule, the total
remaining time, and the current desired leaving
water temperature.
2 Press the left dial to open the menu structure and to:
1 View the status of sensors and actuators.
2 Adjust the current program
To stop an underfloor heating (UFH) screed dryout
U3-error
When the program is stopped by an error or an operation switch off,
the U3 error will be displayed on the user interface. To resolve the
error codes, see
"14.4  Solving problems based on error
codes" [ 4  95].
In case of a power failure, the U3 error is not generated. When
power is restored, the unit automatically restarts the latest step and
continues the program.
Stop UFH screed dryout
To manually stop underfloor heating screed dryout:
1 Go to [A.4.3]: Commissioning > UFH screed
dryout
2 Select Stop UFH screed dryout.
3 Select OK to confirm.
Result: The underfloor heating screed dryout is
stopped.
Read out UFH screed dryout status
When the program is stopped due to an error, an operation switch-
(1)
off, or a power failure
, you can read out the underfloor heating
screed dryout status:
1 Go to [A.4.3]: Commissioning > UFH screed
dryout > Status
2 You can read out the value here: Stopped at + the
step where the underfloor screed dryout was
stopped.
3 Modify and restart the execution of the program.
11.4.6
To start or stop 10-day brine pump
operation
If a brine buffer vessel is part of the brine circuit, or in case a
horizontal brine loop is used, it may be required to let the brine pump
run continuously for 10 days after the system is commissioned. If 10
day brine pump operation is:
▪ ON: The unit operates as normal, except that the brine pump
operates continuously for 10 days, independent of compressor
status.
▪ OFF: Brine pump operation is linked to compressor status.
Conditions: All other commissioning tasks have been completed
before starting the 10 day brine pump operation. After you have
done this, 10 day brine pump operation can be activated in the
commissioning menu.
1 Set the user permission level to Installer. See
change the user permission
2 Go to [A.6]: Commissioning > 10 day brine pump
operation.
(1)
If the UFH screed dryout program was stopped due to a power failure and the power resumes, the program will automatically restart the last
implemented step.
EGSAH/X06+10DA9W(G)
Daikin Altherma 3 GEO
4P569820-1A – 2019.09
"To
level" [ 4  55].

12 Hand-over to the user

3 Select On to start the 10 day brine pump
operation.
Result: The 10 day brine pump operation
starts.
During the 10 day brine pump operation, the setting will be
displayed as ON in the menu. Once the procedure has been
completed, it will change to OFF automatically.
NOTICE
The 10-day brine pump operation will only start if there are
no errors present on the main menu screen and the timer
will only count down if either an underfloor heating screed
dryout is started, or if Space heating/cooling or Tank
operation is enabled.
12
Hand-over to the user
Once the test run is finished and the unit operates properly, please
make sure the following is clear for the user:
▪ Fill in the installer setting table (in the operation manual) with the
actual settings.
▪ Make sure that the user has the printed documentation and ask
him/her to keep it for future reference. Inform the user that he can
find the complete documentation at the URL mentioned earlier in
this manual.
▪ Explain the user how to properly operate the system and what to
do in case of problems.
▪ Show the user what to do for the maintenance of the unit.
▪ Explain the user about energy saving tips as described in the
operation manual.
13

Maintenance and service

NOTICE
Maintenance MUST be done by an authorized installer or
service agent.
We recommend performing maintenance at least once a
year. However, applicable legislation might require shorter
maintenance intervals.
NOTICE
Applicable legislation on fluorinated greenhouse gases
requires that the refrigerant charge of the unit is indicated
both in weight and CO
2
Formula to calculate the quantity in CO
tonnes: GWP value of the refrigerant × total refrigerant
charge [in kg] / 1000
13.1

Maintenance safety precautions

DANGER: RISK OF ELECTROCUTION
DANGER: RISK OF BURNING
NOTICE: Risk of electrostatic discharge
Before performing any maintenance or service work, touch
a metal part of the unit in order to eliminate static electricity
and to protect the PCB.
equivalent.
equivalent
2
Installer reference guide
91