Cz-Rwsl2; Accessories; Installing The Display/Operation Panel - Panasonic CZ-RWSU2 Installation Instructions Manual

Hide thumbs Also See for CZ-RWSU2:
Table of Contents
No.

Accessories

1
Operation Panel
2
Display
3
Remote Control
4
Remote Control Holder

Installing the Display/Operation Panel

Resin Panel
Installing the Operation Panel
1 Remove the 2 screws and remove cover A from the back of the panel. (Fig. A)
2 Fasten the operation panel to the location in the diagram below with the 2 enclosed screws (4 × 10). (Fig. B)
3 Pass the wiring for the display (W2, 6P white connector) through the back of the panel.
Fig. A
Installing the Display
1 Cover B is fi tted inside cover A, so remove the 1 screw and detach it by pressing on it from the front side of the
panel. (Fig. C)
2 Connect the wiring (W2) for the display that is sticking out from the operation panel and fi t the display into the
panel.
Make sure the 6P white connector is fi rmly connected all the way in.
3 Bend the lead wire of the display into shape so it does not come in contact with the louver shaft.
There is a groove in the circled part in diagram 3 that is for passing wire through; press the lead wire into this
groove so there is no slack in it.
4 Attach cover A. When doing so, press it securely into the place indicated by the arrow in Fig D.
5 Shape the lead wire of the operation panel appropriately and fasten it with the enclosed plastic clamp.
6 Install the ceiling panel.
Fig. C
Accessories
Quantity
No.
1
4
Dry-cell Batteries
5
Users Manual
1
6
Truss Self-Tapping Screws
4 × 16
1
7
Pan Head Self-Tapping Screws
4 × 10
1
8
Plastic Clamp L150
Fig. B
Cover A
Display wiring (W2)
Display
Cover B
Connect

CZ-RWSL2

Accessories
Enclosed screws
(4 × 10)
Operation Panel
Fig. D
Quantity
2
1
2
EN
4
3
9
Table of Contents
loading

This manual is also suitable for:

Cz-rwst2Cz-rwsl2Cz-rwsc2

Table of Contents