Controlling The Outdoor Unit - Mitsubishi Electric PURY-P72 Service Handbook

Hide thumbs Also See for PURY-P72:
Table of Contents
[ VII Control ]

[2] Controlling the Outdoor Unit

Outline of Control Method
-1- Outline of Control Method
ŒThe outdoor units are designated as OC and OS in the order of capacity from large to small (if two or more units have the
same capacity, in the order of address from small to large).
ŒThe setting of outdoor unit can be verified by using the self-diagnosis switch (SW4).
SW4 (SW6-10:OFF)
1 2 3
4
5
6 7 8 9 1 0
ON
ŒThe OC determines the operation mode and the control mode, and it also communicates with the indoor units.
ŒThe OS exercises autonomous distributed control (over defrost, error detection, and actuator control etc.) according to the
operation/control mode signals that are sent from the OC.
Startup sequence rotation
-2- Startup sequence rotation
ŒAt the initial startup, outdoor units start up in the order of "OC and OS." When the cumulative operation time of the OC reaches
two hours, the OS will start up before the OC at the next start up.
ŒStartup sequence rotation is performed while all the indoor units are stopped. (Even after two hours of operation, startup se-
quence rotation is not performed while the compressor is in operation.)
In a system with multiple outdoor units (OC and OS), when the integrated operation time of the unit in operation (either OC or
OS) reaches one hour during a cooling operation at low outside temperature, that unit will stop and the other unit will go into
operation.
ŒRefer to [-11-Control at Initial Start-up] for the initial startup.(page 150)
ŒPerforming startup sequence rotation does not change the basic operation of OC and OS. Only startup sequence is changed.
ŒStartup sequence of the outdoor units can be checked with the self-diagnosis switch (SW4) on the OC.
SW4 (SW6-10:OFF)
1 2 3
4
5
6 7 8 9 1 0
ON
Initial Control
-3- Initial Control
ŒWhen the power is turned on, the initial processing of the microcomputer is given top priority.
ŒDuring the initial processing, control processing of the operation signal is suspended. (The control processing is resumed after
the initial processing is completed. Initial processing involves data processing in the microcomputer and initial setting of each
of the LEV opening. This process will take up to 5 minutes.)
ŒDuring the initial processing, the LED monitor on the outdoor unit's control board displays S/W version -> refrigerant type
-> heat pump -> cooling only and capacity -> and communication address in turn every second.
Control at Start-up
-4- Control at Start-up
ŒThe upper limit of frequency during the first 3 minutes of the operation is 50 Hz.
ŒWhen the power is turned on, normal operation will start after the initial start-up mode (to be described later) has been com-
pleted (with a restriction on the frequency).
HWE1116D
ŒThe unit is designated as the OC: "oc" appears on the display.
ŒThe unit is designated as OS: "oS" appears on the display.
ŒOC OS: "oc" and the "OC" address appear alternately on the display.
ŒOS OC: "oS" and the "OS" address appear alternately on the display.
- 144 -
Display
Display
GB
Table of Contents
loading