Summary of Contents for Bosch DSX-N1D8X4-12AT

  • Page 1 DSA E‑Series (E2800 12‑bay) DSA‑N2E8X4‑12AT | DSX‑N1D8X4‑12AT | DSA‑N2C8X4‑12AT | DSA‑N2E8X8‑12AT | DSX‑N1D8X8‑12AT | DSA‑N2C8X8‑12AT | DSA‑N2E8XC‑12AT | DSX‑N1D8XC‑12AT | DSA‑N2C8XC‑12AT | DSA‑N2E8XG‑12AT | DSX‑N1D8XG‑12AT | DSA‑N2C8XG‑12AT Installaton manual...
  • Page 3: Table Of Contents

    Replacing a power-fan canister 8.2.1 Preparing to remove a power-fan canister 8.2.2 Removing a power-fan canister 8.2.3 Installing a power-fan canister 8.2.4 After replacing a power-fan canister Seven-segment display codes Bosch Security Systems B.V. 2021.05 | V3 | DOC Installaton manual...
  • Page 4 Seven-segment display codes when controller turns on 8.3.3 Seven-segment display use cases 8.3.4 Seven-segment display lock-down codes Collecting support data for the storage system Support services and Bosch Academy 2021.05 | V3 | DOC Bosch Security Systems B.V. Installaton manual...
  • Page 5: Safety

    Permanently connected devices must have an external, readily operable mains plug or all‑pole mains switch in accordance with installation rules. – Pluggable devices must have an easily accessible socket-outlet installed near the equipment. Bosch Security Systems B.V. 2021.05 | V3 | DOC Installaton manual...
  • Page 6 SELV circuits. – If safe operation of the unit cannot be ensured, remove it from service and secure it to prevent unauthorized operation. In such cases, have the unit checked by Bosch Security Systems. –...
  • Page 7: Warning Notices

    Do not remove more than one canister from the enclosure while power to the enclosure is turned on. – Bosch products may contain Class 1 laser devices, Class 1M laser devices, or both. – Keep away from moving fan blades.
  • Page 8: Caution Notices

    Notice! This is a class A product. In a domestic environment this product may cause radio interference, in which case the user may be required to take adequate measures. 2021.05 | V3 | DOC Bosch Security Systems B.V. Installaton manual...
  • Page 9 Safety | en Notice! Video loss is inherent to digital video recording; therefore, Bosch Security Systems cannot be held liable for any damage that results from missing video information. To minimize the risk of losing information, we recommend multiple, redundant recording systems, and a procedure to back up all analog and digital information.
  • Page 10: Introduction

    Bosch Product Registration page. Registering your device using an existing NetApp NOW account Sign in to your NetApp NOW account and register your device here. Creating a new account using the Bosch Product Registration page Please register your product: https://www.boschsecurity.com/product-registration/...
  • Page 11: System Overview

    Status display Channel 5 (left) / Channel 6 (right) - Host interface ports (Dual 10 GB iSCSI, RJ45 Base‑T) Note: Use only RJ45 Base‑T ports or optical ports. Power-fan canister 1 On/off switch Bosch Security Systems B.V. 2021.05 | V3 | DOC Installaton manual...
  • Page 12 Note: Use only RJ45 Base‑T ports or optical ports. Power-fan canister 1 On/off switch Mains connection 100 - 240 VAC Power-fan canister 2 12-bay expansion unit - rear view 11 12 13 2021.05 | V3 | DOC Bosch Security Systems B.V. Installaton manual...
  • Page 13: Led Description

    There is an error with the function of one or more of the following: – Unit – Drives – IOMs – Power supplies – Fans The unit, drives, IOMs, power supply, and fans are functioning correctly. Bosch Security Systems B.V. 2021.05 | V3 | DOC Installaton manual...
  • Page 14: Leds On The Controller Unit

    Locate Blue There is an active request to physically locate the controller unit. There is no active request to locate the controller unit. 2021.05 | V3 | DOC Bosch Security Systems B.V. Installaton manual...
  • Page 15: Leds On The I/O Modules

    LED is off: No link is established. 3.2.3 LEDs on the I/O modules The I/O module (IOM) includes the SAS ports for connecting the expansion units to the controller units or to other expansion units. Bosch Security Systems B.V. 2021.05 | V3 | DOC Installaton manual...
  • Page 16: Leds On The Drives

    The port is optimal and no link error has occurred. 3.2.4 LEDs on the drives The drives that are installed in the controller unit and the expansion unit include an Activity LED and an Attention LED. 2021.05 | V3 | DOC Bosch Security Systems B.V. Installaton manual...
  • Page 17: Leds On The Power-Fan Canister

    Each controller unit has a two-digit, seven-segment display at the back, which shows the controller state. Controller state Seven-segment-display Functioning correctly Tray ID Not functioning correctly Diagnostic codes to help identify errors. Bosch Security Systems B.V. 2021.05 | V3 | DOC Installaton manual...
  • Page 18 Diagnostic LED is on, the diagnostic code is displayed instead. Heartbeat Blinking green Indicates normal activity. Diagnostic Green The seven-segment display shows the diagnostic code. The seven-segment display shows the tray ID. 2021.05 | V3 | DOC Bosch Security Systems B.V. Installaton manual...
  • Page 19: Installation

    You can install the unit in either a square-hole or round-hole rack. – If you are installing the unit in a cabinet not provided by Bosch, you must calculate the thermal output of your equipment and compare the results with the target system cabinet's thermal rating.
  • Page 20 (preinstalled on either side of the front of the unit), the holes on the rack or system cabinet, and the holes on the front of rails. 2021.05 | V3 | DOC Bosch Security Systems B.V. Installaton manual...
  • Page 21: Installing The Front Bezel And End Caps

    If applicable, replace the end caps or the system bezel. Note: Additional documentation can be found on the Bosch online catalog. Notice! Install the expansion units below and above the controller unit, keeping the weight in the lower portion of the cabinet.
  • Page 22 Lock in the desired number, and exit the programming mode by pressing and holding the ODP button until the second number stops blinking. Note: It can take up to three seconds for the second number to stop blinking. 2021.05 | V3 | DOC Bosch Security Systems B.V. Installaton manual...
  • Page 23: Connection

    One expansion unit - single controller configuration Controller A IOM B IOM A Three expansion units - single controller configuration Controller A IOM B IOM A IOM B IOM A IOM B IOM A Bosch Security Systems B.V. 2021.05 | V3 | DOC Installaton manual...
  • Page 24 Controller A IOM B IOM A IOM B IOM A IOM B IOM A IOM B IOM A IOM B IOM A IOM B IOM A IOM B IOM A 2021.05 | V3 | DOC Bosch Security Systems B.V. Installaton manual...
  • Page 25: Connecting Expansion Units To A Dual Controller

    Controller A IOM B IOM A Three expansion units - dual controller configuration Controller B Controller A IOM B IOM A IOM B IOM A IOM B IOM A Bosch Security Systems B.V. 2021.05 | V3 | DOC Installaton manual...
  • Page 26: Connecting The Controller Unit To The Network

    Connecting the controller unit to the network In case of a Bosch Video Recording Solution a host is an IP camera. To connect the controller unit to the Ethernet one or two of two available iSCSI host ports must be connected to the Ethernet.
  • Page 27: Connecting The Controller Unit To The Management Hosts

    Connect Ethernet cables between port 1 of controller A and port 1 of controller B to an external Ethernet switch or hub. Connect the management host to the Ethernet switch or hub. Bosch Security Systems B.V. 2021.05 | V3 | DOC Installaton manual...
  • Page 28: Connecting The Units To The Power Supply

    To connect the controller unit and the expansion units to the power supply: Confirm that the two power switches on the controller unit are off. Note: If you have expansion units, confirm that their power switches are off. 2021.05 | V3 | DOC Bosch Security Systems B.V. Installaton manual...
  • Page 29: Supported Connections

    If any of the amber LEDs are on, there might be a problem with a component. Confirm you completed the installation steps correctly. If you are unable to resolve the problem, contact your local Bosch Technical Support team. Supported connections We recommend using the following connection methods: Bosch Security Systems B.V.
  • Page 30 Note: Reserved for maintenance operations if the hardware contains a second Ethernet port. Channel 3 / Controller A and Channel 4 / Controller A and Channel 3 / Controller B (iSCSI, Channel 4 / Controller B (iSCSI, optical) optical) 2021.05 | V3 | DOC Bosch Security Systems B.V. Installaton manual...
  • Page 31 Channel 6 / Controller A is the fallback of Channel 6 /. Controller B – Alternatively: iSCSI, optical Note: – Channel 3 / Controller B is the fallback of Channel 3 / Controller A and Channel 4 / Controller A is the fallback of Channel 4 /. Controller B Bosch Security Systems B.V. 2021.05 | V3 | DOC Installaton manual...
  • Page 32: Turning On/Off Ac Power

    If any of the amber LEDs are on, there might be a problem with a component. Confirm you completed the installation steps correctly. If you are unable to resolve the problem, contact your local Bosch Technical Support team. Connect all cables if required.
  • Page 33: Configuring The Storage System

    LUN Assignment dialog box appears. Note: If multiple iSCSI ports are used, distribute the LUNs equally among the logical iSCSI targets. Do not assign one LUN to multiple logical iSCSI targets. Bosch Security Systems B.V. 2021.05 | V3 | DOC Installaton manual...
  • Page 34 13. Click Yes to confirm. The status of the LUNs changes to Ready. The LUNs are formatted. 2021.05 | V3 | DOC Bosch Security Systems B.V. Installaton manual...
  • Page 35: Maintenance

    Attention LED is on. You can hot-swap a failed drive while the unit is receiving I/O operations. Before you begin – You have a replacement drive that is supported by Bosch for the controller unit or expansion unit. – You have an ESD wristband, or you have taken other antistatic precautions.
  • Page 36: Preparing To Replace A Drive

    Press the release button on the failed drive. The release button is located at the left of the drive. The cam handle on the drive springs open partially, and the drive releases from the midplane. 2021.05 | V3 | DOC Bosch Security Systems B.V. Installaton manual...
  • Page 37: Installing A Drive

    The new drive might be defective. Replace it with another new drive. Note: When you first insert a drive, its Attention LED might be on. However, the LED should go off within a minute. Bosch Security Systems B.V. 2021.05 | V3 | DOC Installaton manual...
  • Page 38: Replacing A Power-Fan Canister

    When the drive reconstruction completes, the volume group is in an optimal state. As required, reinstall the bezel on the front of the unit. Return the failed part to Bosch, as described in the RMA instructions shipped with the kit.
  • Page 39: Preparing To Remove A Power-Fan Canister

    On the Power Supplies and Fans tabs, look at the statuses of the power-fan canisters, the power supplies, and the fans to determine which power-fan canister must be replaced. A component with a Failed status must be replaced. Bosch Security Systems B.V. 2021.05 | V3 | DOC Installaton manual...
  • Page 40: Removing A Power-Fan Canister

    As you remove the power supply, a flap swings into place to block the empty bay, helping to maintain air flow and cooling. Note: When removing a power supply, always use two hands to support its weight. 2021.05 | V3 | DOC Bosch Security Systems B.V. Installaton manual...
  • Page 41: Installing A Power-Fan Canister

    Seven-segment display sequence codes, page 42 – Seven-segment display codes when controller turns on, page 43 – Seven-segment display use cases, page 43 – Seven-segment display lock-down codes, page 44 Bosch Security Systems B.V. 2021.05 | V3 | DOC Installaton manual...
  • Page 42: Seven-Segment Display Sequence Codes

    (--) is the separator between categorydetail code pairs when more than one pair exists in the sequence. End-of-sequence delimiter Blank: The display turns off at the end of a sequence. 2021.05 | V3 | DOC Bosch Security Systems B.V. Installaton manual...
  • Page 43: Seven-Segment Display Codes When Controller Turns On

    (cache backup) The CPU temperature has exceeded the OS OH blank warning level Component failure when the controller is operational Failed host interface card (HIC) OS CF HX blank Bosch Security Systems B.V. 2021.05 | V3 | DOC Installaton manual...
  • Page 44: Seven-Segment Display Lock-Down Codes

    The following table includes the lock-down codes and describes the conditions that cause the controller to be in a suspended state: Lock-down code Description The controller types in a duplex configuration are mismatched. 2021.05 | V3 | DOC Bosch Security Systems B.V. Installaton manual...
  • Page 45 (FRU) has been replaced. A configuration data base corruption has been detected. The SOD reboot limit has been exceeded. In some cases, controllers detect errors during the startup process. Bosch Security Systems B.V. 2021.05 | V3 | DOC Installaton manual...
  • Page 46: Collecting Support Data For The Storage System

    In this command, filename is the file path and the file name to which you want to save the support data. Enclose the file path and the file name in double quotation marks (" "). For example: file="C:\Program Files\CLI\logs\support-data.7z" Select Tools > Verify and Execute 2021.05 | V3 | DOC Bosch Security Systems B.V. Installaton manual...
  • Page 47: Support Services And Bosch Academy

    – Repair & Exchange – Product Security Bosch Building Technologies Academy Visit the Bosch Building Technologies Academy website and have access to training courses, video tutorials and documents: www.boschsecurity.com/xc/en/support/training/ Bosch Security Systems B.V. 2021.05 | V3 | DOC Installaton manual...
  • Page 48 | Support services and Bosch Academy DSA E-Series (E2800 12-bay) 2021.05 | V3 | DOC Bosch Security Systems B.V. Installaton manual...
  • Page 50 Bosch Security Systems B.V. Torenallee 49 5617 BA Eindhoven Netherlands www.boschsecurity.com © Bosch Security Systems B.V., 2021 202105030913...