Appendix
A.2 Examples of acceptance tests
A.2.9
Acceptance test for F-DI status in PROFIsafe telegram 900
Figure A-15
Procedure
To perform the acceptance test of the F-DI status, proceed as follows:
-
1.
2.
You have completed the acceptance test for the F-DI status.
412
Acceptance test for the status of the fail-safe inputs using the example of a SINAMICS
G120D
The inverter is ready
● The inverter signals neither faults nor alarms of the safety functions (r0945[0...7],
r2122[0...7]).
Check the "Low" status of the fail-safe input
1.1.
Switch the signal of the fail-safe digital input to be tested to "low".
1.2.
In the F-CPU, check whether in status word S_ZSW5 the corresponding bit has
the value 0.
Check the "High" status of the fail-safe input
2.1.
Switch the signal of the fail-safe digital input to be tested to "high".
2.2.
In the F-CPU, check whether in status word S_ZSW5 the corresponding bit has
the value 1.
Safety Integrated - SINAMICS G110M, G120, G120C, G120D and SIMATIC ET 200pro FC-2
Function Manual, 01/2017, FW V4.7 SP6, A5E34261271B AD
Status