Concluding Steps - Fujitsu PRIMERGY CX250 S2 Upgrade And Maintenance Manual

Server node
Hide thumbs Also See for PRIMERGY CX250 S2:
Table of Contents
Figure 67: Cable routing with SAS RAID controller (B)
Ê Make sure that the cable will not be damaged here (on both sides).
I
For a complete cabling overview, please refer to section
overview" on page
6.5.1.8

Concluding steps

Perform the following procedures:
"Installing the server node in the server enclosure" on page 63
Ê
Ê Reconnect all external cables.
"Switching on the server node" on page 64
Ê
"Updating RAID controller firmware" on page 73
Ê
"Enabling boot watchdog functionality" on page 74
Ê
CX250 S2
Expansion cards and battery backup units
246.
Upgrade and Maintenance Manual
"Cabling
141