Installing The Mezzanine Sas Raid Controller; Concluding Steps - Fujitsu PRIMERGY CX250 S2 Upgrade And Maintenance Manual

Server node
Hide thumbs Also See for PRIMERGY CX250 S2:
Table of Contents
Expansion cards and battery backup units
6.5.3.4

Installing the mezzanine SAS RAID controller

Ê Mount the mezzanine card bracket on the new RAID controller SAS 6G
8port internal as described in section
onto the card" on page
Ê Re-connect all disconnected cables.
I
For a complete cabling overview, please refer to section
overview" on page
Ê Install the new mezzanine SAS RAID controller as described in section
"Preparing the mezzanine SAS RAID controller" on page
Ê Route the cables as described in section
controller" on page
6.5.3.5

Concluding steps

Perform the following procedures:
"Installing the server node in the server enclosure" on page 63
Ê
Ê Reconnect all external cables.
"Switching on the server node" on page 64
Ê
"Updating RAID controller firmware" on page 73
Ê
"Enabling boot watchdog functionality" on page 74
Ê
148
51.
246.
145.
Upgrade and Maintenance Manual
"Mounting the mezzanine card bracket
"Cable routing with onboard
"Cabling
133.
CX250 S2
Table of Contents
loading

Table of Contents