To Provide The Installation Structure - Daikin Altherma 3 R W Installer's Reference Manual

Hide thumbs Also See for Altherma 3 R W:
Table of Contents
7
|
Unit installation

7.3.3 To provide the installation structure

Installer reference guide
78
Check the strength and level of the installation ground so that the unit will not
cause any operating vibration or noise.
Fix the unit securely by means of foundation bolts in accordance with the
foundation drawing.
This topic shows different installation structures. For all, use 4 sets of M8 or M10
anchor bolts, nuts and washers. In any case, provide at least 300 mm of free space
below the unit. Additionally, make sure the unit is positioned at least 100  mm
above the maximum expected level of snow.
INFORMATION
The maximum height of the upper protruding part of the bolts is 15 mm.
INFORMATION
If you install the U-beams in combination with the low sound cover (EKLN08A1),
different installation instructions apply for the U-beams. See the installation manual
of the low sound cover.
a
a Low sound cover
b Bottom parts of the low sound cover
c U-beams
Option 1: On mounting feet "flexi-foot with strut"
0 mm
(mm)
a Maximum snowfall height
Option 2: On plastic mounting feet
In this case, you can use the bolts, nuts, washers and spring washers delivered with
the unit as accessories.
c
b
ERGA04~08EA + EHBH/X04+08EF
Daikin Altherma 3 R W
4P629085-1B – 2021.11