Position The Tube; Mechanical Setup; Latch Lock Release - GE Definium AMX 700 Operator's Manual

X-ray system
Table of Contents
Figure 4-6 Brake release button
NOTE: The unit may be driven while the system software is booting up.

Position the Tube

This section describes how to setup and position mechanical components of the Definium AMX 700.
Steps for mechanical positioning are organized in the following way.
Adjustment of column and telescoping arm
Rotation of x-ray tube unit, and
Adjustment of collimator

Mechanical Setup

Follow these steps to release the latch, vertical column and telescoping arm locks from the park/
transport position.
Make sure that the unit is turned ON.

Latch Lock Release

1. Grip the collimator handles to activate the switch. (You should hear a clicking sound.) With slight
force, push the telescoping arm down to release latch and then raise up.
Note that you only need to grip one of the collimator handles (Figure 4-7) to activate the lock
release system.
NOTE: Unlatching the tube will activate the monitor. The monitor turns off when the tube is latched to
conserve battery power.
Definium AMX 700 X-Ray System
Operator Manual
5161515-1EN
Rev. 6 (10 February 2008)
© 2008 General Electric Company. All rights reserved.
Chapter 4: Moving and Positioning
4-5
Table of Contents
loading

This manual is also suitable for:

5151481-35151481-4

Table of Contents