Safety Information; Risk Assessment; General Assembly Instructions - Allen-Bradley iTRAK 5730 Installation Instructions Manual

Table of Contents

Safety Information

Follow all safety information that is presented in this section while working
with or near an iTRAK 5730 system.
SHOCK HAZARD: To avoid a shock hazard or personal injury, make sure that all
power has been removed before proceeding. Complete lockout and tagout
procedures to remove input power before servicing.
For applicable installations, before working with an iTRAK 5730 system or
components, review the EU Declaration of Conformity, Directive 2006/42/EC
that is appropriate for your installation and the
Instructions.
2198T Series iTRAK 5730 System without PCM - CE DoI, publication
2198T-CT008
2198T Kinetix iTRAK 5730 System with PCM - CE DoI, publication
2198T-CT009
The iTRAK 5730 system is partially completed machinery. This machinery must
not be put into service until the final machinery into which it is to be
incorporated has been declared in conformity with relevant provisions of the
Machinery Directive.

Risk Assessment

A risk assessment must be prepared for the installation of the machine, within
its application conditions, and with the system components installed. As a
result of the risk assessment, you must implement functions that monitor and
provide for a higher-level measurement of personal safety. The safety
regulations applicable to the installation of the machine must be considered.
Unintended machine movements or other malfunctions are possible if safety
devices are disabled, bypassed, or not activated.

General Assembly Instructions

Follow these overall assembly instructions during installation of your iTRAK
5730 system.
When integrating the iTRAK 5730 system with tools and external
machinery, see
Products/iTrak
See the iTRAK 5730 System Technical Data, publication
for operational ratings. Do not exceed these ratings.
The iTRAK 5730 system must only be used in the environment specified.
See
Chapter 2
Supply and iTRAK Bus Conditioner Module Installation Instructions,
publication
Although system components have IP65 protection, the mover track
rollers exposure to water must be minimized, as they can corrode over
time.
Track rails must be lubricated. See
page
60
for details.
If necessary, additional precautions must be taken to help prevent
excess lubrication from product contamination or external machinery.
Rockwell Automation Publication 2198T-UM003A-EN-P - May 2020
https://motionanalyzer.rockwellautomation.com/
for models and outline drawings.
- Track Installation and Kinetix 5700 iTRAK Power
for system installation instructions.
2198T-IN001
Install the Lubrication System
Chapter 1
Before You Begin Installation
General Assembly
2198T-TD002