  • Page 1 TWO POST LIFT Model: BP-12...
  • Page 2: Table Of Contents

    CONTENTS Product Features and Specifications ............1 Installation Requirement ................3 Steps of Installation ………………………………………………………..…………....4 Exploded View ..................20 Test Run .....................23 Operation Instruction ................24 Maintenance ..................25 Trouble Shooting .................26 Parts List ………..................27...
  • Page 3: Product Features And Specifications

    · Single-point safety release, and dual safety design. · Super-symmetric arms design, make lifts easily find the lift point of the car. ·¢9.5 mm cable using for the lift make it more safety and more reliable. Fig.1 MODEL BP-12 SPECIFICATIONS Width Lifting Lifting...
  • Page 4 Arm Swings View Fig. 2...
  • Page 5: Installation Requirement

    II. INSTALLATION REQUIREMENT A. TOOLS REQUIRED ✓ Rotary Hammer Drill (Φ19) Carpenter’s Chalk ✓ ✓ Hammer Screw Sets ✓ ✓ Level Bar Tape Measure (7.5m) ✓ ✓ English Spanner (12") Pliers ✓ ✓ Ratchet Spanner With Socket (28 Socket Head Wrench ( 6 ✓...
  • Page 6: Steps Of Installation

    B. SPECIFICATIONS OF CONCRETE (See Fig. 4) Specifications of concrete must be adhered to the specification as following. Failure to do so may result in lift and/or vehicle falling. 1. Concrete must be thickness 6in minimum and without reinforcing steel bars,and must be dried completely before the installation.
  • Page 7 Check the parts before assembly 1.Packaged lift and hydraulic power unit (See Fig. 6) Fig. 6 2. Move the lift aside with a fork lift or hoist, and open the outer packing carefully, take off the parts from upper and inside the column, take out the parts box,check the parts according to the shipment parts list (See Fig.
  • Page 8 Parts in the shipment parts list Fig. 9 Parts in the parts box Fig. 10...
  • Page 9 6. Open the parts bag and check the parts according to parts box list (See Fig. 10). Fig. 11 D. Lay down two columns on the installation site parallelly, position the power-side column according to the actual installation site. Usually, it is suggested to install Power side column on the front-right side from which vehicles are driven to the lift.
  • Page 10 E. Position columns and install anchor bolts (See Fig. 13) Check the columns plumbness with level bar, and adjusting with the shims if the columns are not vertical. Anchor bolts should not be tightened. Note: Lifts are designed to two level width, install according to customer’s needs 54/54A 118-1/8”...
  • Page 11 2. Using the prescribed rotary hammer drill, drill all the anchor holes and install the anchor bolts. Then tighten the anchor bolts (See Fig. 16). Note: Torque of Anchors is 150N.m. Minimum embedment of Anchors is 4-1/2”. Drilling Bolting Tighten Fig.
  • Page 12 H. Lift the carriages up by hand and make them be locked at the same level (See Fig.18) Safety block locked at the same level Fig. 18...
  • Page 13 I. Connecting cables (See Fig. 19) 1. Select the width of the foundation according to step E (Fig.13) and select the width of the foundation size 145-3/8”to install the cable.. Note: Cable pass through from one carriage to another must be passed through the hole of the bottom steel plate of carriages steel plate of carriages...
  • Page 14 2.Select the width of the foundation according to step E (Fig.13) and select the width of the foundation size 145-3/8”to install the cable.(Fig.20&Fig21) 2.1. Cable go through from bottom to the top, tighten the two cable nuts when it pass through the opening of the carriage.
  • Page 15 2.2 Foundation size 145-3/8” cable installation diagram. Fig. 21...
  • Page 16 J. Install safety cable 1.Insert safety cable from offside safety lock 2.Insert safety cable from offside safety lock to power-side safety lock according to the arrow direction 3.Tighten the nuts after installing the safety cable Fig.22...
  • Page 17 K. Install power unit and oil hose (See Fig. 23) A View Width in 118-1/8”, use L= 54-7/8”oil hose Width in 123-1/2”, use L= 59-7/8”oil hose. Fig.23...
  • Page 18 Install protect cover (see Fig.24) Note: Install cable protect cover or cable protect cover assy with connecting protect cover according to the foundation width of step 5 Install the cable protect cover assy with protect cover plate, choosing columns width in 123-1/2”...
  • Page 19 I. Install lifting arms 1. Install the lifting arms Lowing the carriages down to the lowest position, (See Fig. 25) wrench to loosen the nut of the fixed gear then use the (See Fig. 26). Adjust the gear according to the arrow direction, tighten the screws until the gear and rack match in good condition (see Fig.28) Use wrench to loosen the Socket...
  • Page 20 Install lifting arm guardrails Fig. 28 Tighten all the hydraulic fittings, and fill the reservoir with hydraulic oil Note: In consideration of Hydraulic Power Unit’s durability and keep the equipment running in the perfect condition, please use Hydraulic Oil 46#. K.
  • Page 21 1.2 Wire connection steps (see Fig.30) 1. Connecting the two power supply wires (active wire L and neutral wire N) to terminals of AC contactor marked L1, L2 respectively. 2. Switch ( connect with terminals of AC contactor marked L1. Terminals A1 connected with terminals of switch 4# Connect power supply wire...
  • Page 22: Exploded View

    IV. EXPLODED VIEW Model BP-12 Car in direction Fig. 32...
  • Page 23 Cylinder Fig. 33 Manual power unit, 220V/60HZ, Single phase (See Fig. 34) Oil return port Relief valve Release valve Throttle valve Release valve Oil Outlet handle Check valve Fig. 34...
  • Page 24 POWER UNIT EXPLODED VIEW 220V/60HZ, single phase Fig. 35...
  • Page 25: Test Run

    V. TEST RUN 1. Adjust synchronous cable (See Fig. 36) Press UP button to lift the carriage up to the Cable Nut position of the cable nut higher than chain pulley. Use wrench to hold the cable fitting, meanwhile use ratchet spanner to tighten the cable nut. Make sure two cables are in the same tension so that two lifting carriages can work synchronously.
  • Page 26: Operation Instruction

    NOTE: It may be vibrated when lifting at start, lifting it with load for several times, the air would be bled and the vibration would be disappeared automatically. Fig. 38 VI. OPERATION INSTRUCTIONS Please read the safety tips carefully before operating the lift To lift vehicle 1.
  • Page 27: Maintenance

    To lower vehicle 1. Be sure clear of around and under the lift, only leaving operator in lift area; 2. Push button “UP” to raise the vehicle slightly, and then release the safety device, lower vehicle by pushing lowering handle. 3.
  • Page 28: Trouble Shooting

    VIII.TROUBLE SHOOTING TROUBLE CAUSE REMEDY 1. Button does not work 1. Replace button 2. Wiring connections are not in good 2.Repair all wiring connections Motor does not condition 3. Motor burned out 3. Repair or replace motor 4. AC contactor burned out 4.
  • Page 29: Parts List

    Model BP-12 PARTS LIST FOR BP-12 BP-12 Item Part# Description Item Part# Description Protect Cover 206032 Snap Ring 207001 Cable Protect Cover 206036 Hair Pin 207002 Cable Protect Cover 217044 Rack Assy 207003 217019 Top Pulley 217045A compressed spring Arm Lock bar (left)
  • Page 30 206049 Alignment Gear 206003A Handle Gun Cover 207011A Lifting Arm 207020 Offside Safety Lock 207012A Outer Arm 209056 Self locking Nut 207013A Middle Arm 420045 Lock washer 207014A Inside Arm 209149 Spring Washer 201002 Hex Bolt 207021 Socket Bolt 217114A Rubber Pad Assy 217029 Pulley Support...
  • Page 31 81400066 Capacitor cover 81400363 Motor Connecting Shaft 81400362 Manifold block 10209149 Lock washer 81400276 Inner hex iron plug 81400259 Red plastic plug 85090142 Innex hex screw 81400280 Gear pump 81400294 Buffer Valve 10209034 Lock washer 81400295 Innex hex screw 81400365 O-Ring 10209152 Zip tie...
  • Page 32 AMGO HYDRAULIC CORPORATION 1931 Jo Rogers Blvd, Manning, South Carolina, USA Zip: 29102 Tel: (803) 505-6410 Fax: (803) 505-6410...