Concluding Steps - Fujitsu PRIMERGY CX272 S1 Upgrade And Maintenance Manual

Server node
Hide thumbs Also See for PRIMERGY CX272 S1:
Table of Contents
Figure 115: Removing the UFM board (B)
Ê The UFM spacer remains on the system board.
9.2.2.3

Concluding steps

Perform the following procedures:
"Installing the server node in the Dual Node Cluster Server" on page 72
Ê
Ê If applicable, reconnect all external cables.
"Switching on the server node" on page 73
Ê
CX272 S1
Upgrade and Maintenance Manual
System board and components
195
Table of Contents
loading

Table of Contents