Be sure to keep this manual in a safe and convenient location for quick reference. Fujitsu makes every effort to prevent users and bystanders from being injured and to prevent property damage. Be sure to use the product according to the instructions in the manual.
Page 4
PRIMEQUEST 1000 Series Hardware Installation Manual Preface Trademarks Organization of this manual This manual is organized as follows. CHAPTER 1 Installation Information Chapter 1 provides various useful information on PRIMEQUEST 1000 series installation. The information includes device configuration details, device outline drawings, installation specifications, and various layout diagrams.
Page 5
PRIMEQUEST 1000 Series Hardware Installation Manual Preface Title Description Manual code SPARC Enterprise/ Provides the necessary information and concepts you C120-H007EN PRIMEQUEST Common should understand for installation and facility planning Installation Planning for SPARC Enterprise and PRIMEQUEST Manual installations. PRIMEQUEST 1000...
Page 6
PRIMEQUEST 1000 Series Hardware Installation Manual Preface Title Description Manual code ServerView Suite Describes how to install and start ServerView None ServerView Operations Operations Manager in a Windows environment. Manager Quick Installation (Windows) ServerView Suite Describes how to install and start ServerView...
Page 7
PRIMEQUEST 1000 Series Hardware Installation Manual Preface Title Description Manual code The Fujitsu Technology Solutions manuals server http://manuals.ts.fujitsu.com/index.php?id=0 MegaRAID SAS Device Provides technical information on using array None Driver Installation controllers. Refer to the manual from the SVS-DVD2 supplied with the product or from the following...
Page 8
PRIMEQUEST 1000 Series Hardware Installation Manual Preface Formal product name Abbreviation Microsoft® Windows Server® 2008 Standard Windows Windows Server 2008 Microsoft® Windows Server® 2008 Enterprise Microsoft® Windows Server® 2008 Datacenter Microsoft® Windows Server® 2008 R2 Standard Microsoft® Windows Server® 2008 R2 Enterprise Microsoft®...
Similarly, one space line is inserted before and after the alert statement. Only Fujitsu certified service engineers should perform the following tasks on this product and the options provided by Fujitsu. Customers must not perform these tasks under any circumstances. Otherwise, electric shock, injury, or fire may result.
PRIMEQUEST 1000 Series Hardware Installation Manual Preface - The PDF file of this manual is intended for display using Adobe® Reader® in single page viewing mode at 100% zoom. - The PRIMEQUEST 1800E2/1800E model supports only 200 V power supply.
Page 11
PRIMEQUEST 1000 Series Hardware Installation Manual Preface * The label is affixed at either location. Warning label location (PRIMEQUEST 1800E2/1800E rear) Warning label location (PRIMEQUEST 1800E2/1800E rear) (IOBs removed) C122-H004-07EN...
Page 12
Notes on Handling the Product Adding optional products For stable operation of the PRIMEQUEST 1000 series server, use only a Fujitsu certified optional product as an added option. Note that the PRIMEQUEST 1000 series server is not guaranteed to operate with any optional product not certified by Fujitsu.
Product and service inquiries For all product use and technical inquiries, contact the distributor where you purchased your product, or a Fujitsu sales representative or systems engineer (SE). If you do not know the appropriate contact address for inquiries about the PRIMEQUEST 1000 series, use the Fujitsu contact line.
However, a number marked with an asterisk (*) denotes a chapter, section, or item in a previous edition of the document. This manual shall not be reproduced or copied without the permission of Fujitsu Limited. Copyright 2010 - 2012 FUJITSU LIMITED...
A.1.1 Arrangements for installation work ....................48 A.2 Rack Mounting Requirements ........................ 51 A.2.1 Requirements for mounting in a Fujitsu 19-inch rack ................ 51 A.2.2 Requirements for mounting in a rack manufactured by another company ........57 A.3 Fujitsu 19-inch Racks ..........................
Page 16
PRIMEQUEST 1000 Series Hardware Installation Manual Contents B.4 Cable Connector ............................ 86 Index ................................. 87 C122-H004-07EN...
Page 18
PRIMEQUEST 1000 Series Hardware Installation Manual Figures FIGURE A.17 Outline drawing of the 19-inch rack Model 1624 (base/without stabilizer) ........ 73 FIGURE A.18 Outline drawing of the 19-inch rack Model 1624 (expansion/with stabilizer) ......74 FIGURE A.19 Outline drawing of the 19-inch rack Model 1624 (expansion/without stabilizer) .......
CHAPTER 1 Installation Information This chapter provides various useful information on PRIMEQUEST 1000 series installation. The information includes device configuration details, device outline drawings, installation specifications, and various layout diagrams. 1.1 Device Configuration Details ........2 1.2 Outline Drawings of the Devices ........
PRIMEQUEST 1000 Series Hardware Installation Manual CHAPTER 1 Installation Information Outline Drawings of the Devices This section provides outline drawings of each device. 1.2.1 PRIMEQUEST 1800E2/1800E outline drawings 1.2.2 PCI_Box outline drawings 1.2.1 PRIMEQUEST 1800E2/1800E outline drawings This section includes outline drawings of the PRIMEQUEST 1800E2/1800E (front, rear, top, and right side views).
PRIMEQUEST 1000 Series Hardware Installation Manual CHAPTER 1 Installation Information PRIMEQUEST 1800E2/1800E (top view) FIGURE 1.3 PRIMEQUEST 1800E2/1800E (top view) PRIMEQUEST 1800E2/1800E (right side view) FIGURE 1.4 PRIMEQUEST 1800E2/1800E (right side view) 1.2.2 PCI_Box outline drawings This section includes outline drawings of the PCI_Box (front, rear, top, and right side views).
PRIMEQUEST 1000 Series Hardware Installation Manual CHAPTER 1 Installation Information FIGURE 1.5 PCI_Box front view PCI_Box rear view FIGURE 1.6 PCI_Box rear view PCI_Box top view FIGURE 1.7 PCI_Box top view PCI_Box right side view FIGURE 1.8 PCI_Box right side view...
PRIMEQUEST 1000 Series Hardware Installation Manual CHAPTER 1 Installation Information Item Description Maximum Operating Input voltage: 200 V 4.00 kW / 4.21 kVA power Standby Input voltage: 200 V 95 W / 126 VA consumption/ apparent power Power factor (*10) 0.95 or more...
Page 28
PRIMEQUEST 1000 Series Hardware Installation Manual CHAPTER 1 Installation Information Item Description Weight [kg (lb)] (*2) 150 (330) Air conditioning Maximum heat output [kJ/h (BTU/h)] 14,400 (13,649) requirements Exhaust air FAN at low speed (Low) 14 (494) flow [m /min...
PRIMEQUEST 1000 Series Hardware Installation Manual CHAPTER 1 Installation Information - A = Number of mounted SBs (1 to 4) - B = Number of mounted IO Units (1 or 2) - C = Number of mounted expansion power supply units (0 to 2) *3 If the intake air temperature is high (but within the normal temperature range), the fan enters high-speed mode even when operation is normal.
Page 30
PRIMEQUEST 1000 Series Hardware Installation Manual CHAPTER 1 Installation Information Item Description Noise [dB] (Included in main unit specifications) Acoustic power level [B] (Included in main unit specifications) Allowable vibration Operating (including standby state) 4.0 (400) (synthetic [m/s (gal)] seismic waves) Non-operating (*6) 10.0...
This section shows the installation area and service areas of the PRIMEQUEST 1000 series and PCI_Box. The diagrams assume that the devices are mounted in Fujitsu 19-inch racks. The actual installation and service areas may vary depending on the 19-inch rack with the mounted device. For...
PRIMEQUEST 1000 Series Hardware Installation Manual CHAPTER 1 Installation Information Description Service area Front of the device FIGURE 1.10 Service area with the 19-inch rack model 1640 (19R-164xx) installed C122-H004-07EN...
PRIMEQUEST 1000 Series Hardware Installation Manual CHAPTER 1 Installation Information Description Service area Front of the device FIGURE 1.11 Service area with the 19-inch rack model 1624 (19R-162xx) installed C122-H004-07EN...
PRIMEQUEST 1000 Series Hardware Installation Manual CHAPTER 1 Installation Information Cooling and Exhaust Air Flows in the Devices This section shows the cooling and exhaust air flows in each device. 1.5.1 Cooling and exhaust air flows in the PRIMEQUEST 1800E2/1800E 1.5.2 Cooling and exhaust air flows in the PCI_Box...
PRIMEQUEST 1000 Series Hardware Installation Manual CHAPTER 1 Installation Information 1.5.2 Cooling and exhaust air flows in the PCI_Box Description Air intake Exhaust air Exhaust vent FIGURE 1.13 Cooling and exhaust air flows in the PCI_Box C122-H004-07EN...
PRIMEQUEST 1000 Series Hardware Installation Manual CHAPTER 1 Installation Information 1.6.3 Seawater (salt damage) The air in the vicinity of coastal areas contains large amounts of airborne sea salt particles. If these particles remain inside computers, substances are formed by a condensation reaction of chemicals. These substances and the humidity lead to insulation failure and the corrosion and deterioration of components and materials.
PRIMEQUEST 1000 Series Hardware Installation Manual CHAPTER 1 Installation Information Security Actions For details on security actions, see "CHAPTER 8 Security Actions" in the SPARC Enterprise/PRIMEQUEST Common Installation Planning Manual (C120-H007EN). C122-H004-07EN...
CHAPTER 2 Connection Information This chapter describes the cables used with the PRIMEQUEST 1000 series and provides an overview of cable connections. 2.1 Overview of Connections ........... 20 2.2 Signal Cable Connections .......... 23 2.3 Power Cable Connections .......... 32 2.4 Input Power Connection Specifications ......
PRIMEQUEST 1000 Series Hardware Installation Manual CHAPTER 2 Connection Information Overview of Connections This section describes an overview of connections for the PRIMEQUEST 1000 series. 2.1.1 Overview of Connections (PRIMEQUEST 1800E2) FIGURE 2.1 Overview of device connections (PRIMEQUEST 1800E2) shows an overview of device connections for the PRIMEQUEST 1800E2.
PRIMEQUEST 1000 Series Hardware Installation Manual CHAPTER 2 Connection Information Number in Component Description Figure 2.1 GSPB PRIMEQUEST 1800E2 Up to 2 units can be mounted. PRIMEQUEST 1800E2 Up to 2 units can be mounted. PCI_Box PRIMEQUEST 1800E2 Up to 2 units can be connected.
PRIMEQUEST 1000 Series Hardware Installation Manual CHAPTER 2 Connection Information TABLE 2.2 Notes on device connections (PRIMEQUEST 1800E) Number in Component Description Figure 2.2 System board PRIMEQUEST 1800E Up to 4 units can be mounted. IO board PRIMEQUEST 1800E Up to 2 units can be mounted.
PRIMEQUEST 1000 Series Hardware Installation Manual CHAPTER 2 Connection Information Signal Cable Connections This section provides a cable connection diagram and a list of signal cables. The section also describes dos and don'ts on cable preparation. 2.2.1 Basic interfaces and peripheral devices (PRIMEQUEST 1800E2) 2.2.2 Basic interfaces and peripheral devices (PRIMEQUEST 1800E)
Page 44
PRIMEQUEST 1000 Series Hardware Installation Manual CHAPTER 2 Connection Information - The numbers in parentheses ( ) correspond to the cable numbers in TABLE 2.3 Cables (for the basic interfaces and peripheral devices) (PRIMEQUEST 1800E2) - For a 10GBase-CR cable, use the 10GBase-CR (TWINAX) cable specified for the connected switch product.
PRIMEQUEST 1000 Series Hardware Installation Manual CHAPTER 2 Connection Information Name Model name Commercially available types Length CBL-MLLC40 40 m CBL-MLLC50 50 m CBL-MLLD1A Sold separately: 100 m (with cable 100 m insulation) Dual LC connector - Dual LC connector...
PRIMEQUEST 1000 Series Hardware Installation Manual CHAPTER 2 Connection Information FIGURE 2.4 Interface cable connections (for the basic interfaces and peripheral devices) (PRIMEQUEST 1800E) Remarks The numbers in parentheses ( ) correspond to the cable numbers in TABLE 2.4 Cables (for the basic interfaces and peripheral devices) (PRIMEQUEST 1800E).
Page 47
PRIMEQUEST 1000 Series Hardware Installation Manual CHAPTER 2 Connection Information Name Model name Commercially available types Length TPCBL-B100 100 m Enhanced Category 5 TPCBL-C005 Sold separately: Select from lengths of 5, 10, UTP cable 15, 30, 50, and 100 m.
PRIMEQUEST 1000 Series Hardware Installation Manual CHAPTER 2 Connection Information Name Model name Commercially available types Length CBL-MLSC40 40 m CBL-MLSC50 50 m CBL-MLSA1A Sold separately: 100 m (with cable 100 m insulation) Dual LC connector - Dual SC connector...
PRIMEQUEST 1000 Series Hardware Installation Manual CHAPTER 2 Connection Information FIGURE 2.6 External interface connectors in the PRIMEQUEST 1800E2/1800E main unit (rear view) MMB external interfaces in detail FIGURE 2.7 MMB external interfaces in detail IOB external interfaces in detail...
PRIMEQUEST 1000 Series Hardware Installation Manual CHAPTER 2 Connection Information Power Cable Connections This section shows diagrams of the input power distribution for the PRIMEQUEST 1000 series main unit and the PCI_Box. 2.3.1 Power cable connections of the PRIMEQUEST 1800E2/1800E 2.3.2 Power cable connections of the PCI_Box...
PRIMEQUEST 1000 Series Hardware Installation Manual CHAPTER 2 Connection Information FIGURE 2.12 Redundant power supply configuration (primary power feed, redundant power supply) *1 Power cables (AC#0 to AC#2) are connected to PSUs (PSU#0 to PSU#2) on a one-to-one basis. *2 This change to the power supply configuration requires a redundant power supply (200 V), which must be prepared separately.
PRIMEQUEST 1000 Series Hardware Installation Manual CHAPTER 2 Connection Information 2.3.2 Power cable connections of the PCI_Box This section shows diagrams of the input power distribution for the PCI_Box. Remarks Use the same power configuration for the PCI_Box as that for the main unit, which is either a redundant configuration or dual power feed configuration.
PRIMEQUEST 1000 Series Hardware Installation Manual CHAPTER 2 Connection Information FIGURE 2.15 200 to 240 V redundant power supply configuration (primary power feed, redundant power supply) *1 Power cables (AC#0 to AC#1) are connected to PSUs (PSU#0 to PSU#1) on a one-to-one basis.
PRIMEQUEST 1000 Series Hardware Installation Manual CHAPTER 2 Connection Information FIGURE 2.16 200 to 240 V dual power feed configuration *1 Power cables (AC#0 to AC#1) are connected to PSUs (PSU#0 to PSU#1) on a one-to-one basis. *2 This change to the power supply configuration requires a redundant power supply (200 V) for the PCI_Box, and the power supply must be prepared separately.
PRIMEQUEST 1000 Series Hardware Installation Manual CHAPTER 2 Connection Information FIGURE 2.17 100 to 120 V configuration (primary power feed, no redundant power supply) *1 The power cable (AC#0) is connected to the PSU (PSU#0) on a one-to-one basis. *2 This change to the power supply configuration requires a 100 V power supply for the PCI_Box, and the power supply must be prepared separately.
PRIMEQUEST 1000 Series Hardware Installation Manual CHAPTER 2 Connection Information Input Power Connection Specifications This section lists the specifications of input power connections. 2.4.1 PRIMEQUEST 1000 series main unit 2.4.2 PCI_Box 2.4.3 Connections between the power distribution box and distribution panel 2.4.1...
PRIMEQUEST 1000 Series Hardware Installation Manual CHAPTER 2 Connection Information 2.4.3 Connections between the power distribution box and distribution panel TABLE 2.7 Specifications of the power cable between the power distribution box and distribution panel lists the specifications of power cables between the power distribution box and distribution panel.
FIGURE 2.19 Power cable connections under a raised floor (except in Europe) Remarks - The above figure shows an example with the device mounted in a Fujitsu 19-inch rack. - The values in parentheses ( ) are in inches. C122-H004-07EN...
PRIMEQUEST 1000 Series Hardware Installation Manual CHAPTER 2 Connection Information Shutoff Characteristic of the Customer's Distribution Panel (Only When Connected to the Power Distribution Box) To protect the device when it is connected to the customer's distribution panel through a power distribution box, the breaker of the device (or the power distribution box) must trip before the corresponding breaker in the customer's distribution panel.
CHAPTER 3 Notes on Carrying In and Installing the Product This chapter provides notes on carrying in and installing the PRIMEQUEST 1000 series server. 3.1 Elevator Load Conditions ........... 44 3.2 Earthquake Preparedness Measures ......45...
PRIMEQUEST 1000 Series Hardware Installation Manual CHAPTER 3 Notes on Carrying In and Installing the Product Elevator Load Conditions The rack with the device mounted is wider than the average computer. Therefore, to use an elevator to carry in the rack, the rack may need the side boards or doors removed before loading on the elevator.
To prevent damage to the computer system from an earthquake, Fujitsu provides an earthquake countermeasure called "fixed construction." (A fixed construction prevents the device from falling by fixing it in place.)
Page 66
PRIMEQUEST 1000 Series Hardware Installation Manual CHAPTER 3 Notes on Carrying In and Installing the Product C122-H004-07EN...
APPENDIX A Racks This appendix provides various information on the mounting racks for the PRIMEQUEST 1000 series and PCI_Box. A.1 Rack Mounting ............48 A.2 Rack Mounting Requirements ........51 A.3 Fujitsu 19-inch Racks ..........60...
APPENDIX A Racks Rack Mounting The PRIMEQUEST 1000 series (including peripheral devices) has been developed and its operation guaranteed with the basic assumption that it is mounted in a Fujitsu 19-inch rack. The requirements in A.1.1 Arrangements for installation work must be satisfied for safe use of a unit mounted in a Fujitsu 19-inch rack.
Page 69
PRIMEQUEST 1000 Series Hardware Installation Manual APPENDIX A Racks Remarks Consider Select a rack. Select a fixed Arrange for an earthquake- construction. optional resistant earthquake- anchoring for rack resistance kit. installation. to be attached to the sides of the rack.
Page 70
PRIMEQUEST 1000 Series Hardware Installation Manual APPENDIX A Racks (2) Select a rack. For a rack to be fixed in place, select one that comes without a stabilizer. See "(3) Select a fixed construction" below. For a rack not to be fixed in place, be sure to select one that comes with a stabilizer. See TABLE A.1 Arrangements...
Requirements for mounting in a Fujitsu 19-inch rack This section explains the requirements for mounting in a Fujitsu 19-inch rack. For safe use of the PRIMEQUEST 1000 series server mounted in a Fujitsu 19-inch rack, observe the mounting requirements described below.
* The external dimensions do not include protrusions. Note The Fujitsu 19-inch rack comes with a blank panel covering the front of each empty space that has no mounted device. If warm exhaust air from the device circulates to the front of the rack and reenters the device, it may cause a temperature alarm and lead to a device failure.
Page 73
PRIMEQUEST 1000 Series Hardware Installation Manual APPENDIX A Racks For the models 2742/2737/2724/2642/2624/2616, the bottom of the mounted device must not be below 2U. It is not mountable at 1U of the lowest rack. For details, contact the distributor where you purchased your product, or your sales representative.
2742/2737/2724/2642/2624/2616/1740/1640/1624) If the attached cable holders are in the mounting area for the PRIMEQUEST 1000 series server in the Fujitsu 19- inch rack, remove the cable holders or adjust the mounting location of the server so that the mounting area does not include the locations of the cable holders.
PRIMEQUEST 1000 Series Hardware Installation Manual APPENDIX A Racks Description PRIMEQUEST 1800E2/1800E Locations of the cable holders to be removed (Both sides of the (upper) front cover) FIGURE A.3 Cable holder locations C122-H004-07EN...
PRIMEQUEST 1000 Series Hardware Installation Manual APPENDIX A Racks Procedure for removing cable holders (Model 1740) Remove the cable holders by using a Phillips screwdriver. Description M5 screw Cable holder Phillips screwdriver FIGURE A.4 Removing a cable holder (Model 1740) Procedure for removing cable holders (Model 1640/Model 1624) Remove the cable holders by using a Phillips screwdriver.
PRIMEQUEST product specifications and requirements. Note Fujitsu does not guarantee there will be no problems arising from the mounting of the PRIMEQUEST 1000 series server (including peripheral devices) in a rack manufactured by another company.
PRIMEQUEST 1000 Series Hardware Installation Manual APPENDIX A Racks The device is mounted in a rack using a rack mounting kit (supplied with the PRIMEQUEST 1000 series server). Therefore, the following conditions regarding distance must be satisfied. One condition is the allowable spacing between posts.
- Securing the maintenance work area (service area) Secure the service area required for the maintenance work performed by a Fujitsu certified service engineer. Referring to the Fujitsu rack service areas in 1.4 Installation Area...
PRIMEQUEST 1000 Series Hardware Installation Manual APPENDIX A Racks Fujitsu 19-inch Racks This section shows the types, outline drawings, and bottom view drawings of Fujitsu 19-inch racks. A.3.1 Types of 19-inch rack A.3.2 Outline drawings of 19-inch racks A.3.3 Bottom view drawings of 19-inch racks...
Page 81
PRIMEQUEST 1000 Series Hardware Installation Manual APPENDIX A Racks Item Model name Product name Width Depth Height Total Rack Total Remarks (*1) (*1) (*1) weight weight rack capacity (*2) weight (*2)(*3) (*2) (expansion/ without side without boards stabilizer) (standard) (*5)
PRIMEQUEST 1000 Series Hardware Installation Manual APPENDIX A Racks Item Model name Product name Width Depth Height Total Rack Total Remarks (*1) (*1) (*1) weight weight rack capacity (*2) weight (*2)(*3) (*2) (expansion/ with stabilizer) (slim) 19R-162B2 19-inch rack 1050...
PRIMEQUEST 1000 Series Hardware Installation Manual APPENDIX A Racks Description Top view Rear view Right side view Front view Stabilizer Top cover FIGURE A.8 Outline drawing of the 19-inch rack Model 1740 (base/with stabilizer) C122-H004-07EN...
PRIMEQUEST 1000 Series Hardware Installation Manual APPENDIX A Racks 19-inch rack Model 1740 (base/without stabilizer) Description Top view Rear view Right side view Front view FIGURE A.9 Outline drawing of the 19-inch rack Model 1740 (base/without stabilizer) 19-inch rack Model 1740 (expansion/with stabilizer)
Page 85
PRIMEQUEST 1000 Series Hardware Installation Manual APPENDIX A Racks C122-H004-07EN...
PRIMEQUEST 1000 Series Hardware Installation Manual APPENDIX A Racks Description Top view Rear view Right side view Front view Bottom view Leveling foot Caster FIGURE A.10 Outline drawing of the 19-inch rack Model 1740 (expansion/with stabilizer) 19-inch rack Model 1740 (expansion/without stabilizer)
PRIMEQUEST 1000 Series Hardware Installation Manual APPENDIX A Racks Description Top view Rear view Right side view Front view FIGURE A.11 Outline drawing of the 19-inch rack Model 1740 (expansion/without stabilizer) 19-inch rack Model 1640 (base/with stabilizer) C122-H004-07EN...
PRIMEQUEST 1000 Series Hardware Installation Manual APPENDIX A Racks Description Top view Rear view Right side view Front view Stabilizer Top cover FIGURE A.12 Outline drawing of the 19-inch rack Model 1640 (base/with stabilizer) 19-inch rack Model 1640 (base/without stabilizer)
PRIMEQUEST 1000 Series Hardware Installation Manual APPENDIX A Racks Description Top view Rear view Right side view Front view FIGURE A.13 Outline drawing of the 19-inch rack Model 1640 (base/without stabilizer) 19-inch rack Model 1640 (expansion/with stabilizer) C122-H004-07EN...
Page 90
PRIMEQUEST 1000 Series Hardware Installation Manual APPENDIX A Racks Description Top view Rear view Right side view C122-H004-07EN...
PRIMEQUEST 1000 Series Hardware Installation Manual APPENDIX A Racks Description Front view Bottom view Leveling foot Caster FIGURE A.14 Outline drawing of the 19-inch rack Model 1640 (expansion/with stabilizer) 19-inch rack Model 1640 (expansion/without stabilizer) Description Top view C122-H004-07EN...
PRIMEQUEST 1000 Series Hardware Installation Manual APPENDIX A Racks Description Rear view Right side view Front view FIGURE A.15 Outline drawing of the 19-inch rack Model 1640 (expansion/without stabilizer) 19-inch rack Model 1624 (base/with stabilizer) Description Top view Rear view...
PRIMEQUEST 1000 Series Hardware Installation Manual APPENDIX A Racks Description Top cover FIGURE A.16 Outline drawing of the 19-inch rack Model 1624 (base/with stabilizer) 19-inch rack Model 1624 (base/without stabilizer) Description Top view Rear view Right side view Front view FIGURE A.17 Outline drawing of the 19-inch rack Model 1624 (base/without stabilizer)
PRIMEQUEST 1000 Series Hardware Installation Manual APPENDIX A Racks Description Top view Rear view Right side view Front view Bottom view Leveling foot Caster FIGURE A.18 Outline drawing of the 19-inch rack Model 1624 (expansion/with stabilizer) C122-H004-07EN...
PRIMEQUEST 1000 Series Hardware Installation Manual APPENDIX A Racks 19-inch rack Model 1624 (expansion/without stabilizer) Description Top view Rear view Right side view Front view FIGURE A.19 Outline drawing of the 19-inch rack Model 1624 (expansion/without stabilizer) A.3.3 Bottom view drawings of 19-inch racks This section provides bottom view drawings of 19-inch racks.
PRIMEQUEST 1000 Series Hardware Installation Manual APPENDIX A Racks Bottom view drawing of the rack equipped with the pullout stabilizer (standard type only) Bottom view drawing of connected 19-inch racks (standard) Bottom view drawing of connected 19-inch racks (slim) Bottom view drawing of the (standard) 19-inch rack FIGURE A.20 Bottom view drawing of the (standard) 19-inch rack...
PRIMEQUEST 1000 Series Hardware Installation Manual APPENDIX A Racks FIGURE A.21 Bottom view drawing of the (slim) 19-inch rack Bottom view drawing of the rack equipped with the pullout stabilizer (standard type only) C122-H004-07EN...
PRIMEQUEST 1000 Series Hardware Installation Manual APPENDIX A Racks FIGURE A.22 Bottom view drawing of the rack equipped with the pullout stabilizer (standard type only) Bottom view drawing of connected 19-inch racks (standard) C122-H004-07EN...
APPENDIX B UPC Interface This appendix describes the UPC interface that can be used with the PRIMEQUEST 1000 series. B.1 Overview ..............82 B.2 Signal Cable .............. 83 B.3 Connection of Main Unit and CVCF and Signal Line Definitions .............. 84 B.4 Cable Connector ............
PRIMEQUEST 1000 Series Hardware Installation Manual APPENDIX B UPC Interface Overview The CVCF provides a stable power supply to the system even in the event of a power abnormality or major power outage. Through a connection between the CVCF and a UPC port on the main unit with a signal cable, the CVCF can notify the main unit of abnormal power conditions when it detects them.
PRIMEQUEST 1000 Series Hardware Installation Manual APPENDIX B UPC Interface Signal Cable For the signal cable, use a shielded-pair cable that satisfies the following specifications. - Direct current resistance (round trip/one pair): 400 W/km or lower - Cable length: up to 10 m (33 ft.)
PRIMEQUEST 1000 Series Hardware Installation Manual APPENDIX B UPC Interface Connection of Main Unit and CVCF and Signal Line Definitions This section shows the connection of the main unit and CVCF. This section also provides definitions of the signal lines.
Page 105
PRIMEQUEST 1000 Series Hardware Installation Manual APPENDIX B UPC Interface Signal name Function The length of the time from when the *ACOFF signal goes ON to when shutdown processing actually starts can be specified from the MMB according to the operation. (*1) The signal becomes valid when this line and GND (pin 5) are short-circuited.
PRIMEQUEST 1000 Series Hardware Installation Manual APPENDIX B UPC Interface Cable Connector This section describes the connector type and the correspondence between the UPC interface and the signal cable pins. Connector type D-SUB9 male connector (receptacle: female) Pin assignment The figure below shows the UPC interface and pin assignment of the signal cable.
PRIMEQUEST 1000 Series Hardware Installation Manual Index Index [Numbers] External interface connectors in the PRIMEQUEST 100 to 120 V configuration (primary power feed, no 1800E2/1800E main unit (front view)......redundant power supply)..........External interface connectors in the PRIMEQUEST 100 to 120 V redundant power supply configuration (primary 1800E2/1800E main unit (rear view).......
Page 108
PRIMEQUEST 1000 Series Hardware Installation Manual Index Outline Drawings of the Devices........Specifications of the power cable between the power Overview................distribution box and distribution panel......Overview of Connections..........Standard configuration (primary power feed, no redundant Overview of device connections (PRIMEQUEST 1800E)..