Layout Constraints - GE Innova 2100-IQ Preinstallation Manual

Cardiovascular imaging system
Hide thumbs Also See for Innova 2100-IQ:
Table of Contents
Innova 2100-IQ, 3100/3100-IQ, 4100/4100-IQ Cardiovascular Imaging System Pre-Installation Manual
GE Healthcare

1.8 Layout Constraints

88
The X-Ray tube Chiller elevation cannot exceed 3 meters (9.84 feet) in height.
Minimum distance between Digital Detector and UPS is 3 m (118 inches) (Fluoro
UPS option).
The distance of the Detector chiller cannot exceed 3 m (1 floor) in height below the
detector.
Direction 5160944-13-1EN, Revision 2
1 Room Layout Considerations
Table of Contents
loading

This manual is also suitable for:

Innova 3100Innova 3100-iqInnova 4100Innova 4100-iq

Table of Contents