2. Preparation before Automatic Operation
2.1 Component Library Data
Open the "Control Data" tab sheet in the "Component Library" edit window
and set the "Rejected Component Discharge Position".
Rejected Component Discharge Position
Select the "Rejected Component Discharge Position" from the following
options.
0701-001
2. Preparation before Automatic Operation
Auto
• Component External Size :
Recycle Conveyor
Cmpnt Storage Box
Fig. 4
: The component is discharged onto the
recycle conveyor or into the component
storage box according to the component
external size.
When either of X or Y is 10 mm
or more, such component is dis-
charged onto the recycle conveyor.
: The components are discharged onto the
recycle conveyor.
: The components are discharged into the
component storage box.
18
Tg1481-ID-SO