After Switch Installation - Cisco Catalyst 9500 Series Hardware Installation Manual

Hide thumbs Also See for Catalyst 9500 Series:
Table of Contents

After Switch Installation

Figure 39: Mounting the Switch in a Rack
1
After Switch Installation
• Configure the switch using the Web User Interface. For more information, see "Configuring the Switch
• Connect the required devices to the switch ports.
• Turn on the power supply switches to power up the system. While powering up, the switch performs a
• Verify port connectivity after connecting devices to the switch ports. The LED turns green when the
Cisco Catalyst 9500 Series Switches Hardware Installation Guide
46
Front-mounting position
Using the Web User Interface" topic in the Software Configuration Guide.
series of bootup diagnostic tests.
Note
The switch is designed to boot up in less than 30 minutes, provided
that the neighboring devices are in fully operational state.
switch and the attached device have a link.
2
Number-12 or number-10 Phillips machine
screws
Installing a Switch
Table of Contents
loading

Table of Contents