III. STEPS OF INSTALLATION
A. Location of installation
Check and insure the installation location (concrete, layout, space size etc.) is
suitable for lift installation.
B. Check the parts before assembly
1, The equipment should be unload and transfer by forklift. (See Fig.5)
×
2. Received lift and hydraulic power unit
3. Open the outer packing carefully, check all the parts according to the parts list
.
Fig. 7)
Shipment Parts List
Fig. 5
(See Fig. 6)
Fig. 6
Parts box
Power side Platform
Fig. 7
- 4 -
√
.
Drive-in Ramp
Offside Platform
(See
Cross Beam
Column