Quick Links

Smart Communications
PowerLink 100 and
PowerLink 50
P3.5
Product Information
E50405-U53-X-B3-7670
Preface
Open Source Software
Table of Contents
Safety Instructions
PowerLink Description in Brief
Installation of the Module Frames
Connecting the Device
The Connector Panel
Commissioning
Service Program PowerSys
1
2
3
4
5
6
7
Table of Contents
loading

Summary of Contents for Siemens PowerLink 100

  • Page 1 Preface Open Source Software Table of Contents Smart Communications Safety Instructions PowerLink 100 and PowerLink Description in Brief PowerLink 50 Installation of the Module Frames P3.5 Connecting the Device The Connector Panel Product Information Commissioning Service Program PowerSys E50405-U53-X-B3-7670...
  • Page 2 Although including rights created by patent grant or registration of a Siemens AG has made best efforts to keep the document utility model or a design, are reserved. as precise and up-to-date as possible, Siemens AG shall...
  • Page 3: Preface

    Equipment Manual The Equipment Manual describes the functions and applications of a specific PowerLink device. Additional Support For questions about the system, please contact your Siemens sales partner. Support Our Customer Support Center provides a 24-hour service. Energy Customer Support Center Tel.: +49 180 524 7000...
  • Page 4 Comply with all instructions, in order to avoid property damage. ² NOTE Important information about the product, product handling or a certain section of the documentation, which must be given particular attention. Smart Communications, PowerLink 100 and PowerLink 50, Product Information E50405-U53-X-B3-7670, Edition 11.2014...
  • Page 5: Open Source Software

    Open Source Software according to the Open Source Software license agreement. Should contradictions occur between the Open Source Software license conditions and the Siemens license conditions applicable to the product, the Open Source Software license agreement with respect to the Open Source Software shall prevail.
  • Page 6 Smart Communications, PowerLink 100 and PowerLink 50, Product Information E50405-U53-X-B3-7670, Edition 11.2014...
  • Page 7: Table Of Contents

    PowerLink Description in Brief.......................... 21 Overview..........................22 Transmission Mode......................23 Frequency Range......................... 24 Frequency Grid........................25 Mechanical Construction...................... 26 PowerLink 100 CFS-2 Part....................27 PowerLink 50........................28 Installation of the Module Frames........................29 Introduction...........................30 Smart Communications, PowerLink 100 and PowerLink 50, Product Information E50405-U53-X-B3-7670, Edition 11.2014...
  • Page 8 Switching on the Device....................... 44 Mounting of Modules in the PowerLink ................45 Service Program PowerSys..........................49 About the Service Program PowerSys................. 50 PC Requirements......................... 51 Installation of the Service Program PowerSys..............52 Smart Communications, PowerLink 100 and PowerLink 50, Product Information E50405-U53-X-B3-7670, Edition 11.2014...
  • Page 9: Safety Instructions

    Safety Instructions Scope of Delivery Transport, Package and Storage Incoming Inspection Electrical Inspection Electrostatic Sensitive Devices Installation Replacement Smart Communications, PowerLink 100 and PowerLink 50, Product Information E50405-U53-X-B3-7670, Edition 11.2014...
  • Page 10: Scope Of Delivery

    PowerLink • The Product Information with a detailed system description and all necessary instructions for installation and alarm handling For further details, refer to the attached DVD! Smart Communications, PowerLink 100 and PowerLink 50, Product Information E50405-U53-X-B3-7670, Edition 11.2014...
  • Page 11: Transport, Package And Storage

    ² parts must be stored at a temperature between –40° C and +70° C. Siemens recommends that you observe a restricted storage temperature range of +10° C to +35° C in ² order to prevent the electrolytic capacitors used in the power supply from aging prematurely.
  • Page 12: Incoming Inspection

    ² return it to the manufacturer, stating the defect. Use the original packaging or transport packaging that meets the requirements. Siemens recommends that you check the device and the connectors which are not assembled. Double Pole/Neutral Fusing [dwfusesa-191211-01.tif, 1, en_US]...
  • Page 13: Electrical Inspection

    , grounding area ≥ M4). Connecting the Device 1.4.3 Connect all cables and lines. Use the connection diagrams stated in the Equipment Manual. ² Tighten the terminal screws. ² Smart Communications, PowerLink 100 and PowerLink 50, Product Information E50405-U53-X-B3-7670, Edition 11.2014...
  • Page 14: Safety Notes

    If the suspect for a defect is confirmed by Customer Support, pack the device and return it to the manufacturer, stating the defect. Use transport packaging that meets the requirements. Smart Communications, PowerLink 100 and PowerLink 50, Product Information E50405-U53-X-B3-7670, Edition 11.2014...
  • Page 15: Electrostatic Sensitive Devices

    The device can be damaged if it is not operated in accordance with regulations of the operation. Provide sufficient cooling or heating (for outside operation in cold areas or during cold times). ² Smart Communications, PowerLink 100 and PowerLink 50, Product Information E50405-U53-X-B3-7670, Edition 11.2014...
  • Page 16 The grounding wire must not be disconnected until all work has been completed if you are disassembling the system. If possible, do not touch the modules and wiring before the work has been completed. ² Smart Communications, PowerLink 100 and PowerLink 50, Product Information E50405-U53-X-B3-7670, Edition 11.2014...
  • Page 17: Installation

    If you do not comply with the safety notes, this will result in death, severe injury, or considerable material damage. Make sure that the power is turned OFF before installing or removing the power supply. ² Smart Communications, PowerLink 100 and PowerLink 50, Product Information E50405-U53-X-B3-7670, Edition 11.2014...
  • Page 18: Completing Installation

    In case you installed a new module, configure the settings of the new module in PowerSys. ² NOTE Only qualified electrical engineering personnel is authorized to reset the hardware parameters. Smart Communications, PowerLink 100 and PowerLink 50, Product Information E50405-U53-X-B3-7670, Edition 11.2014...
  • Page 19: Replacement

    If you do not comply with the safety notes, this will result in death or severe injuries. Install plug-in modules on the electrically deactivated device only. ² Remove the front plate from the device. ² Carefully pull out the plug-in module. ² Smart Communications, PowerLink 100 and PowerLink 50, Product Information E50405-U53-X-B3-7670, Edition 11.2014...
  • Page 20: Completing Replacement

    In case you installed a new module, configure the settings of the new module in PowerSys. ² NOTE Only qualified electrical engineering personnel is authorized to reset the hardware parameters. Smart Communications, PowerLink 100 and PowerLink 50, Product Information E50405-U53-X-B3-7670, Edition 11.2014...
  • Page 21: Powerlink Description In Brief

    PowerLink Description in Brief Overview Transmission Mode Frequency Range Frequency Grid Mechanical Construction PowerLink 100 CFS-2 Part PowerLink 50 Smart Communications, PowerLink 100 and PowerLink 50, Product Information E50405-U53-X-B3-7670, Edition 11.2014...
  • Page 22: Overview

    1 to 5 StationLink Board Link CFS-2 Carrier frequency section PLPA PowerLink power amplifier CSPi Central Signal Processing AMP50 power amplifier 50 W receive filter Transmit filter fractional E1 interface Smart Communications, PowerLink 100 and PowerLink 50, Product Information E50405-U53-X-B3-7670, Edition 11.2014...
  • Page 23: Transmission Mode

    PowerLink Description in Brief 2.2 Transmission Mode Transmission Mode The signals are transmitted using the single side band method (amplitude modulation) with suppressed carrier Smart Communications, PowerLink 100 and PowerLink 50, Product Information E50405-U53-X-B3-7670, Edition 11.2014...
  • Page 24: Frequency Range

    The transmission is carried out in the frequency range from 24 kHz to 1000 kHz. The frequency positions of the HF send and receive band can be selected regular or inversed. Smart Communications, PowerLink 100 and PowerLink 50, Product Information E50405-U53-X-B3-7670, Edition 11.2014...
  • Page 25: Frequency Grid

    Frequency Grid The frequency grid is adjustable to 2.5 kHz resp. 4 kHz. The frequency adjustment is possible in steps of the half grid (1.25 kHz resp. 2 kHz). Smart Communications, PowerLink 100 and PowerLink 50, Product Information E50405-U53-X-B3-7670, Edition 11.2014...
  • Page 26: Mechanical Construction

    PowerLink Description in Brief 2.5 Mechanical Construction Mechanical Construction PowerLink 100 systems consists of 2 module frames, the carrier-frequency section (CFS-2) and the line equipment section (PLPA). For the PLPA section, a distinction is made between 50 W and 100 W transmit power.
  • Page 27: Powerlink 100 Cfs-2 Part

    The mounting positions for the integrated SWT 3000 can be equipped with the processing unit PU4 and 2 interface modules IFC. NOTE For more details concerning the functional description of the PowerLink and integrated SWT 3000 we refer you to the PowerLink Equipment Manual. Smart Communications, PowerLink 100 and PowerLink 50, Product Information E50405-U53-X-B3-7670, Edition 11.2014...
  • Page 28: Powerlink 50

    The ports for the external interfaces are located on the rear side connector panel. For VF telephone channels and for RS232 channels Sub-D 25 pin sockets are existing. Smart Communications, PowerLink 100 and PowerLink 50, Product Information E50405-U53-X-B3-7670, Edition 11.2014...
  • Page 29: Installation Of The Module Frames

    Installation of the Module Frames Introduction Dimensions of the PowerLink System Smart Communications, PowerLink 100 and PowerLink 50, Product Information E50405-U53-X-B3-7670, Edition 11.2014...
  • Page 30: Introduction

    The module carriers are suitable for installation in 19" swing frames or mounting frames. The fastening elements which are required are included in the scope of delivery. No special tools are needed for the instal- lation. Smart Communications, PowerLink 100 and PowerLink 50, Product Information E50405-U53-X-B3-7670, Edition 11.2014...
  • Page 31: Dimensions Of The Powerlink System

    Installation of the Module Frames 3.2 Dimensions of the PowerLink System Dimensions of the PowerLink System PowerLink 100 [dwdplsys-110111-01.tif, 1, en_US] Figure 3-1 Dimensions of a PowerLink 100 Smart Communications, PowerLink 100 and PowerLink 50, Product Information E50405-U53-X-B3-7670, Edition 11.2014...
  • Page 32 Min. distance between two PowerLink devices is one unit of height (= 1.75 inches or 44.45 mm). NOTE A flyback diode should be used for any relays that is connected to an output of PowerLink or iSWT to avoid EMC influences. Smart Communications, PowerLink 100 and PowerLink 50, Product Information E50405-U53-X-B3-7670, Edition 11.2014...
  • Page 33: Connecting The Device

    Connecting the Device Protective Earth Connection Connection of the Supply Voltage Smart Communications, PowerLink 100 and PowerLink 50, Product Information E50405-U53-X-B3-7670, Edition 11.2014...
  • Page 34: Protective Earth Connection

    Connection of the PE conductor The protective earth conductor of the PowerLink must be connected with the housing. Figure 4-3 The connection of the PE conductor on PowerLink 50 is shown in Smart Communications, PowerLink 100 and PowerLink 50, Product Information E50405-U53-X-B3-7670, Edition 11.2014...
  • Page 35: Connection Of The Supply Voltage

    The AC supply voltage is connected to the terminals PE-N-L1. In case of DC voltage the (-) is connected to the N and (+) to the L1 terminal. The terminals are covered. Smart Communications, PowerLink 100 and PowerLink 50, Product Information E50405-U53-X-B3-7670, Edition 11.2014...
  • Page 36 An easily accessible all pole disconnect device with a contact gap of at least 3.0 mm must be included/ installed in the building-installation-wiring. The value of the external fuse has to be max. 16A! ² Smart Communications, PowerLink 100 and PowerLink 50, Product Information E50405-U53-X-B3-7670, Edition 11.2014...
  • Page 37: The Connector Panel

    The Connector Panel Interconnection of PLPA Unit and CFS-2 Interconnection of PLPA Unit and HF-Connecting Board PowerLink 50 HF-Connection Smart Communications, PowerLink 100 and PowerLink 50, Product Information E50405-U53-X-B3-7670, Edition 11.2014...
  • Page 38: Interconnection Of Plpa Unit And Cfs-2

    BNC jacks on the CFS-2 have to be connected to the corresponding BNC jacks on the PLPA. [sclnplcf-110111-01.tif, 1, en_US] Figure 5-1 Interconnection of PLPA and CFS-2 section for PowerLink 100 Smart Communications, PowerLink 100 and PowerLink 50, Product Information E50405-U53-X-B3-7670, Edition 11.2014...
  • Page 39: Interconnection Of Plpa Unit And Hf-Connecting Board

    Overall connection diagram from the PLE unit to the HF connecting board NOTE Please make sure that the “a” and “b” conductors are not exchanged! In case of 75 Ohm impedance, the “b” wire and GND are linked. Smart Communications, PowerLink 100 and PowerLink 50, Product Information E50405-U53-X-B3-7670, Edition 11.2014...
  • Page 40: Powerlink 50 Hf-Connection

    The Connector Panel 5.3 PowerLink 50 HF-Connection PowerLink 50 HF-Connection The figure below shows the PowerLink 50 HF-connection. [PowerLink_50S_rueck_offen, 1, --_--] Figure 5-3 PowerLink 50 HF-connection Smart Communications, PowerLink 100 and PowerLink 50, Product Information E50405-U53-X-B3-7670, Edition 11.2014...
  • Page 41: Commissioning

    Commissioning Overview Switching on the Supply Voltage Switching on the Device Mounting of Modules in the PowerLink Smart Communications, PowerLink 100 and PowerLink 50, Product Information E50405-U53-X-B3-7670, Edition 11.2014...
  • Page 42: Overview

    This equipment can be powered by and connected to different independent energy sources. Death or severe injuries can occur if specified instructions are not observed. Before any maintenance work, the device must be isolated with the specified separators. ² Smart Communications, PowerLink 100 and PowerLink 50, Product Information E50405-U53-X-B3-7670, Edition 11.2014...
  • Page 43: Switching On The Supply Voltage

    After switching on the external supply voltage and with the device switched off (switch S1 enable/disable Power Supply on CSPi in down position) LED "i" (red) lights up on the PSPA2 power supply unit(s). Smart Communications, PowerLink 100 and PowerLink 50, Product Information E50405-U53-X-B3-7670, Edition 11.2014...
  • Page 44: Switching On The Device

    Front cover of the PowerLink processor module CSPi (partial covered) NOTE For more details concerning the commissioning of the PowerLink and integrated SWT 3000, we refer you to the PowerLink Equipment Manual. Smart Communications, PowerLink 100 and PowerLink 50, Product Information E50405-U53-X-B3-7670, Edition 11.2014...
  • Page 45: Mounting Of Modules In The Powerlink

    Mounting of Modules in the PowerLink Module Slot Positions in the PowerLink 100 [dw_slpplm-181114, 1, --_--] Figure 6-2 Slot positions of the PowerLink 100 Modules CFS-2 part Intergrated SWT 3000-2 Intergrated SWT 3000-1 Smart Communications, PowerLink 100 and PowerLink 50, Product Information E50405-U53-X-B3-7670, Edition 11.2014...
  • Page 46 Disable the power supply (move the switch S1 on the CSPi module above PC connector into lower posi- tion). In case of exchanging a module: • Remove the existing module and place it on a grounded, conductive surface. Smart Communications, PowerLink 100 and PowerLink 50, Product Information E50405-U53-X-B3-7670, Edition 11.2014...
  • Page 47 (configuration, level setting etc.). Please refer to the corresponding instructions in chapter Commissioning of the Power Link 50/100 equipment manual! Smart Communications, PowerLink 100 and PowerLink 50, Product Information E50405-U53-X-B3-7670, Edition 11.2014...
  • Page 48 Smart Communications, PowerLink 100 and PowerLink 50, Product Information E50405-U53-X-B3-7670, Edition 11.2014...
  • Page 49: Service Program Powersys

    Service Program PowerSys About the Service Program PowerSys PC Requirements Installation of the Service Program PowerSys Smart Communications, PowerLink 100 and PowerLink 50, Product Information E50405-U53-X-B3-7670, Edition 11.2014...
  • Page 50: About The Service Program Powersys

    SWT 3000 units. The following description applies to the program versions P3.5.x and higher. The term SWT 3000 is employed for stand-alone protection signaling units and iSWT for devices integrated in Power- Link. Smart Communications, PowerLink 100 and PowerLink 50, Product Information E50405-U53-X-B3-7670, Edition 11.2014...
  • Page 51: Pc Requirements

    Pentium or better (or processor with equivalent performance) Clock Minimum 1 GHz System memory 1 GB DVD drive Ethernet interface 10/100Base-T Serial (local) interface Additional needed software Microsoft .NET Framework Smart Communications, PowerLink 100 and PowerLink 50, Product Information E50405-U53-X-B3-7670, Edition 11.2014...
  • Page 52: Installation Of The Service Program Powersys

    Regional and Language Options (settings) other than German or English (UK) can cause problems. Siemens strongly recommends that you switch Windows to one of the mentioned settings (Start > Control panel > Regional and Language Options). Reasons for the problems are the different formats for numbers, date, and time.
  • Page 53 With the PowerSys software, the SWTStraps program is also delivered. The program is useful to carry out the jumper settings for the SWT 3000 as well as iSWT modules. You can find the SWTStraps program on the PowerSys DVD. Smart Communications, PowerLink 100 and PowerLink 50, Product Information E50405-U53-X-B3-7670, Edition 11.2014...
  • Page 54 Smart Communications, PowerLink 100 and PowerLink 50, Product Information E50405-U53-X-B3-7670, Edition 11.2014...

This manual is also suitable for:

Powerlink 50

Table of Contents