Hitachi DS7000 Series Installation Manual

Advanced server
Hide thumbs Also See for DS7000 Series:
Series
Installation Guide
MK-97HAS7013-02
August 2020
Table of Contents
loading

Summary of Contents for Hitachi DS7000 Series

  • Page 1 Series Installation Guide MK-97HAS7013-02 August 2020...
  • Page 2 Licensee may not make any other copies of the Materials. "Materials" mean text, data, photographs, graphics, audio, video and documents. Hitachi reserves the right to make changes to this Material at any time without notice and assumes no responsibility for its use. The Materials contain the most current information available at the time of publication.
  • Page 3: Table Of Contents

    ........2-21 2.4.1. Installing the rails for the Hitachi DS7080 Server Assemblies 2-21 2.4.2.
  • Page 5: Preface

    Preface This guide explains how to install the server for the first time. Note Consult the Hitachi Vantara support web site for the most up­to­date product information, documentation, firmware updates, software fixes and service offers: http://support.HitachiVantara.com Intended Readers This guide is intended for use by qualified personnel in charge of installing the server cabinet.
  • Page 7: Checking The Delivery Contents

    Chapter 1. Checking the Delivery Contents 1.1. Unpacking the Server Important Before unpacking the server inspect the server packaging for damage. W020 WARNING W020: The server drawer must not be unpacked before it has reached the room temperature (24 hours in the computer room). According to the server configuration, the following items are included: •...
  • Page 8: Identifying The Server

    Identifying the Server 1.2.1. Identifying the Server Model The server model is provided on the safety label on the side of the server. Model Name Commercial Name M3S2G2 Hitachi DS7020 server M3S2G4 Hitachi DS7040 server M3S2G8 Hitachi DS7080 server M3XU16 UBox 1.2.2.
  • Page 9 Slave Label Example Front view A label is also available at the front, behind the bezel. Chapter 1. Checking the Delivery Contents...
  • Page 10: Checking Safety Labels

    1.3. Checking Safety Labels Safety warning labels, including safety notices and graphic symbols, are located on each server module. Check that the electrical installation in place complies with the label details. 1.3.1. Server Module Labels Server Identification Label The label is located on the side of the server. Mark Description Recycling symbol: indicates the mandatory obligation to...
  • Page 11 W071 WARNING W071: This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) this device may not cause harmful interference and (2) this device must accept any interference received including interference that may cause undesired operation Server Module Identification Label Rear view The label is located inside a little drawer.
  • Page 12: Ubox Labels

    1.3.2. UBox Labels UBox Identification Label The label is located on the side of the server. Mark Description Recycling symbol: indicates the mandatory obligation to reuse and recycle electronic and electrical equipment properly. Tropicalization symbol: indicates that the device must be operated within the adequate limits of temperature and humidity.
  • Page 13 W071 WARNING W071: This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) this device may not cause harmful interference and (2) this device must accept any interference received including interference that may cause undesired operation UBox Onboard Battery Label C003 CAUTION...
  • Page 14 C044 CAUTION C044: This unit has more than one power supply cord. Disconnect all power supply cords from the unit before servicing. Proceed as follows: 1. Power OFF the server 2. Switch OFF the site power breakers 3. Remove all power supply cords from the unit Installation Guide...
  • Page 15: Installing The Server In The Rack Cabinet

    Chapter 2. Installing the Server in the Rack Cabinet 2.1. Installing a Hitachi DS7020 Server D013 DANGER D013: The server weighs 40 kg when fully populated. Two people are required to unpack it and install it in the cabinet. Important The server is delivered fully populated. It is mandatory to use a lifting device to install it.
  • Page 16 Procedure 1. Prepare the rails 1. Loosen the four screws of each rail. Installation Guide...
  • Page 17 2. Adjust the length of each rail. 3. Tighten the four screws of each rail. Chapter 2. Installing the Server in the Rack Cabinet...
  • Page 18 2. From the front, install the left rail Installation Guide...
  • Page 19 3. From the front, install the right rail Chapter 2. Installing the Server in the Rack Cabinet...
  • Page 20 4. From the front, install the Hitachi DS7020 server compute box Insert the server using the guiding pins. 5. Secure the server in place 1. Push the server until it stops. 2. Tighten both captive screws. Front view Installation Guide...
  • Page 21: Installing A Hitachi Ds7040 Server

    2.2. Installing a Hitachi DS7040 Server D047 DANGER D047: The server weighs 80 kg when fully populated. Important The server is delivered fully populated. It is mandatory to use a lifting device to install it. However, it is possible to reduce the server weight by removing the components from the compute box.
  • Page 22 Procedure 1. Prepare the rails 1. Loosen the four screws of each rail. Installation Guide...
  • Page 23 2. Adjust the length of each rail. 3. Tighten the four screws of each rail. Chapter 2. Installing the Server in the Rack Cabinet...
  • Page 24 2. From the front, install the left rail 2-10 Installation Guide...
  • Page 25 3. From the front, install the right rail Chapter 2. Installing the Server in the Rack Cabinet 2-11...
  • Page 26 4. From the front, install the Hitachi DS7040 server compute box 2-12 Installation Guide...
  • Page 27 5. Secure the Hitachi DS7040 server compute box in place 1. Push the server until it stops. 2. Tighten the four captive screws. Front view Chapter 2. Installing the Server in the Rack Cabinet 2-13...
  • Page 28: Installing A Hitachi Ds7080 Server

    2.3. Installing a Hitachi DS7080 Server D048 DANGER D048: The server weighs 160 kg when fully populated. Important The server is delivered fully populated. It is mandatory to use a lifting device to install it. However, it is possible to reduce the server weight by removing the components from the compute box.
  • Page 29 2. Adjust the length of each rail. 3. Tighten the four screws of each rail. Chapter 2. Installing the Server in the Rack Cabinet 2-15...
  • Page 30 2. From the front, install the left rail 2-16 Installation Guide...
  • Page 31 3. From the front, install the right rail Chapter 2. Installing the Server in the Rack Cabinet 2-17...
  • Page 32 4. Install the Hitachi DS7080 server compute box 1. Insert the Hitachi DS7080 server compute box into the rack cabinet . 2-18 Installation Guide...
  • Page 33 2. Push the server until the front face is 5 cm from the rack cabinet edge. 3. Insert two cage nuts in the rack cabinet frames for the upper server screws. 4. Push the server until it stops. Chapter 2. Installing the Server in the Rack Cabinet 2-19...
  • Page 34 5. Secure the Hitachi DS7080 server compute box into place Tighten the four captive screws. 2-20 Installation Guide...
  • Page 35: Installing A Hitachi Ds7160 Server

    T25 Torx screwdriver PH1 Cross-headed screwdriver Flat screwdriver Lifting device 2.4.1. Installing the rails for the Hitachi DS7080 Server Assemblies Procedure 1. Prepare the rails 1. Loosen the four screws of each rail. Chapter 2. Installing the Server in the Rack Cabinet...
  • Page 36 2. Adjust the length of each rail. 3. Tighten the four screws of each rail. 2-22 Installation Guide...
  • Page 37 2. From the front, install the left rail at the bottom of the rack (rack slot 1) Chapter 2. Installing the Server in the Rack Cabinet 2-23...
  • Page 38 3. From the front, install the right rail at the bottom of the rack (rack slot 1) 2-24 Installation Guide...
  • Page 39 4. Place the other set of rails at the rack slot 14 at the left Perform the operations to secure in place the second set of rails. Chapter 2. Installing the Server in the Rack Cabinet 2-25...
  • Page 40 5. Place the other set of rails at the rack slot 14 at the right Perform the operations to secure in place the second set of rails. 2-26 Installation Guide...
  • Page 41: Installing The Rails For The Ubox

    2.4.2. Installing the Rails for the UBox Procedure 1. Prepare the rails 1. Loosen the four screws of each rail. 2. Adjust the length of each rail. Chapter 2. Installing the Server in the Rack Cabinet 2-27...
  • Page 42 3. Tighten the four screws of each rail. 2-28 Installation Guide...
  • Page 43 2. From the front, install the left rail at the rack slot 9 Chapter 2. Installing the Server in the Rack Cabinet 2-29...
  • Page 44 3. From the front, install the right rail at the rack slot 9 2-30 Installation Guide...
  • Page 45: Installing All The Chassis

    2.4.3. Installing all the Chassis Procedure 1. Install the Hitachi DS7080 server compute box 1. Insert the Hitachi DS7080 server compute box into the rack cabinet . Chapter 2. Installing the Server in the Rack Cabinet 2-31...
  • Page 46 2. Push the server until the front face is 5 cm from the rack cabinet edge. 3. Insert two cage nuts in the rack cabinet frames for the upper server screws. 4. Push the server until it stops. 2-32 Installation Guide...
  • Page 47 2. Secure the Hitachi DS7080 server compute box into place Tighten the four captive screws. Chapter 2. Installing the Server in the Rack Cabinet 2-33...
  • Page 48 3. Install the empty UBox at the rack slot 9 1. Insert the UBox into the rack cabinet. 2. Push the UBox until it stops. 4. Secure the UBox in place Tighten the four captive screws. 2-34 Installation Guide...
  • Page 49 5. Install the Hitachi DS7080 server assembly at the rack slot 14 Perform the operations to secure in place the second Hitachi DS7080 server assembly. Chapter 2. Installing the Server in the Rack Cabinet 2-35...
  • Page 50: Installing The 8-Module Connecting Box

    2.4.4. Installing the 8-Module Connecting Box Procedure 1. Take hold of the new component 1. Loosen the fixing pins (A) and the captive screws (B). 2. Remove the cover using the handles (C). 2-36 Installation Guide...
  • Page 51 2. Partially insert the 8-module connecting box into its location Watch out for the position of the 8-module connecting box. Rear view Chapter 2. Installing the Server in the Rack Cabinet 2-37...
  • Page 52 3. Remove the shipping brackets Four brackets are installed for shipment and must be removed. 1. Loosen the captive screws. 2-38 Installation Guide...
  • Page 53 2. Remove the brackets. Chapter 2. Installing the Server in the Rack Cabinet 2-39...
  • Page 54 4. Secure the 8-module connecting box in place 1. Push the 8-module connecting box completely in. 2-40 Installation Guide...
  • Page 55 2. Tighten the captive screws (A) and fixing pins (B). Chapter 2. Installing the Server in the Rack Cabinet 2-41...
  • Page 56 5. Install the cover 1. Install the cover using the handles (C). 2. Secure the cover in place by tightening the fixing pins (A) and the captive screws (B). 2-42 Installation Guide...
  • Page 57: Installing The Ubox Components

    6. Install all the UBox PSUs For each UBox PSU, perform the following steps: 1. Check the UBox PSU position Look at the label inside the PSU slot. 2. Press the latch of the UBox PSU 3. Push the UBox PSU in using the handle 4.
  • Page 58 2. Insert the UNB module and push it completely 3. Close the handles 4. Tighten the captive screw on the handles 2-44 Installation Guide...
  • Page 59 3. Install all the SCI modules For each SCI module, perform the following steps: 1. Check the handle of the SCI module is in the open position 2. Insert the SCI module and push it completely 3. Close the handle 4.
  • Page 60 4. Install the LMB module 1. Check the handles of the LMB module are in the open position 2. Insert the LMB module and push it completely 3. Close the handles 4. Tighten the captive screw on the handles 2-46 Installation Guide...
  • Page 61 5. Install the CLKB modules For each CLKB module perform the following steps: 1. Insert the CLKB module 2. Push it completely 6. Install all the UNB fan modules For each UNB fan module, perform the following steps: Insert the UNB fan module and push it completely using the handle Chapter 2.
  • Page 62 7. Install the UBox bezel 1. Put in place the bezel 2. Check the position of the pilot pin B with the hole C 3. Tighten the captive screws A 2-48 Installation Guide...
  • Page 63: Appendix A. Installing A Lightened Server

    Appendix A. Installing a Lightened Server D048 DANGER D048: The server weighs 160 kg when fully populated. The server is delivered fully populated. It is possible to reduce the server weight by removing the components from the compute box. However it is mandatory to use a lifting device.
  • Page 64 4. Pull the main box out of the compute box by the handles. 3. Unlock the latch of the PCIe blade 4. Take hold of the handle and carefully remove the PCIe blade Installation Guide...
  • Page 65 5. Pull the latch of the PSU up 6. Take hold of the handle and carefully remove the PSU Appendix A. Installing a Lightened Server...
  • Page 66: Installing The Compute Box In The Rack Cabinet

    A.2. Installing the Compute Box in the Rack Cabinet Proceed in the same way as for the fully populated server. It is mandatory to use a lifting device. 1. From the front, install the compute box 2. Secure the compute box in place by tightening the captive screws Installation Guide...
  • Page 67: Installing The Components Into The Compute Box

    A.3. Installing the Components into the Compute Box 1. Carefully install the main boxes, all the PCIe blades and the PSUs 2. From the front, insert the main box into the compute box 3. Secure the main box in place 1.
  • Page 68 2. Tighten both captive screws. 4. Install the PSUs at the rear 1. Look at the labels on the PSU slot sides to check the PSU positions. Installation Guide...
  • Page 69 2. Position a PSU in the slot on the left hand side with the latch (B) at the bottom. Rear view 3. Take hold of the PSU by the handle (A). 4. Push the PSU using the handle (A) until the latch (B) locks. 5.
  • Page 70 7. Push the PSU using the handle (A) until the latch (B) locks. 5. Locate all the PCIe blades slots for a module Rear view 6. Install all the PCIe blades For all PCIe blades: 1. Unlock the latch. Installation Guide...
  • Page 71 2. Insert the PCIe blade into the compute box using the handle. 3. Check that the latch is closed. Appendix A. Installing a Lightened Server...
  • Page 73: Appendix B. Nuts, Screws And Washers

    Appendix B. Nuts, Screws and Washers This appendix describes all nuts, screws and washers included in the delivery. Screws Mark Head Body Diameter Length 5 mm 16 mm Washers Mark Head Body Diameter 5 mm Nuts Mark Head Body Diameter 5 mm Appendix B.
  • Page 74 Installation Guide...
  • Page 76 Hitachi...

This manual is also suitable for:

Ds7020Ds7040Ds7080Ds7160

Table of Contents