Hide thumbs Also See for TruVision NVR 40:

Quick Links

GE
Security
TruVision NVR 40 Quick Start Guide
Content
Description 1
Handling safety 1
Operating safety 1
Rack system precautions 1
Package content 2
Unpacking the NVR 40 2
Before you begin 2
NVR 40 installation and rack mount 2
Front panel 2
Turning on the TruVision NVR 40 3
TruVision NVR 40 configuration 3
Front panel LEDs 4
Troubleshooting 4
Packaging and warranty conditions 4
Description
The TruVision NVR 40 is a network video recorder capable
of recording video from up to 12 or 24 IP cameras
(depending on the specific model). TruVision NVR 40 has
either two or four SATA disks (storing 1 TB each).
This quick start guide gives you step-by-step instructions on
how to install and configure the TruVision NVR 40 unit.
Important: If you are using the device within a GE-NAV 3.0
(or later) environment, go to the following site to get the
latest version of the software:
http://www.gesecurity.com/portal/site/GESecurity/menuite
m.11620ebca5cc0a06574efe10140041ca/?vgnextoid=d0b5
6e992c81e110VgnVCM100000592d7003RCRD
If you are using the VisioWave/UltraView CCS or VSC
software solution, refer to CCS or VSC user manuals.
Handling safety
A fully assembled TruVision NVR 40 unit can weigh
up to 18 kg (40 lb.). Do not try to lift this by yourself. A safe
lifting height is 20U.
Operating safety
Permanently unplug the unit if you think that it has become
damaged and before you move it.
The TruVision NVR 40 unit operates from a power supply
input voltage range of 100 to 240 VAC, 50 to 60 Hz.
A safe electrical earth connection must be provided to the
power cord.
Rack system precautions
The following safety requirements must be considered
when the unit is mounted in a rack:
The unit must be mounted in a 19" rack.
The rack construction must support the total weight of
the installed units and the design should incorporate
stabilizing features suitable to prevent the rack from
tipping or being pushed over during installation or in
normal use.
When loading a rack with the units, fill the rack from
the bottom up and empty it from the top down.
The rack design should take into consideration the
maximum operating ambient temperature for the unit,
which is 40°C (104°F).
The rack should have a safe electrical distribution
system and it must not be overloaded by the total
number of units installed in the rack.
The electrical distribution system must provide a
reliable earth for each unit and for the rack.
© 2009 GE Security, Inc.
P/N 1069163 • REV 1.0 • ISS 13OCT09
loading

Summary of Contents for GE TruVision NVR 40

  • Page 1 Before you begin 2 damaged and before you move it. NVR 40 installation and rack mount 2 The TruVision NVR 40 unit operates from a power supply Front panel 2 input voltage range of 100 to 240 VAC, 50 to 60 Hz.
  • Page 2 Remove the accessories box. Gently remove the TruVision NVR 40 unit from the Figure 2: NVR 40 handles and screw position for rack mount shipping case and put it in a safe place.
  • Page 3 (see Figure 5): User name: admin To start the TruVision NVR 40 unit and connect to the Password: admin network, follow this procedure: Note: You can change this password later in the Connect the power cord to the unit.
  • Page 4 VOS (video operating This LED indicates when the system) identification LED embedded software (VisioWave Security Service) has detected an abnormal condition or a failure.* In case of storage failure (LED is constant red), contact technical support. TruVision NVR 40 Quick Start Guide...