Cisco Nexus 7706 Switch Center-Mount Rails Kit - Cisco Nexus 7706 Hardware Installation Manual

Nexus 7000 series
Hide thumbs Also See for Nexus 7706:
Table of Contents

Cisco Nexus 7706 Switch Center-Mount Rails Kit

Note
All power cords will not be orderable at first customer shipment (FCS).
The available DC power cords for the 3.5-kW HVAC/HVDC power supplies are as follows:
• CAB-HV-25A-SG-US1—power cord, 400-VDC 20A, Saf-D-Grid/Saf-D-Grid, North America
• CAB-HV-25A-SG-US2—power cord, 300-VAC/500-VDC 20A, Ring Terminal/Saf-D-Grid, North
• CAB-HV-25A-SG-IN1—power cord, 400-VDC 20A, IEC/EU, Saf-D-Grid/Saf-D-Grid, International
• CAB-HV-25A-SG-IN2—power cord, 300-VAC/500-VDC 20A, IEC/EU, Ring Terminal/Saf-D-Grid,
Note
All power cords will not be orderable at first customer shipment (FCS).
Cisco Nexus 7706 Switch Center-Mount Rails Kit
The Center-Mount Kit is not included in the accessory kit, but, if you are centering the chassis on a two-post
rack, you must order this kit (part number N7K-C7706-CMK=) when you order the switch. The following
table lists the contents for this kit.
Description
Center-mount rack mounting brackets (right and left
brackets)
Center-mount bottom support rails (right and left rails)
Crossbar
12-24 x 3/4-in. Phillips screws
M6 x 19-mm Phillips screws
M4 x 8-mm screws
Cisco Nexus 7706 Hardware Installation Guide
170
America
International
Quantity
2
2
1
20
20
2
Accessory Kits
OL-31330-01