Power Up The Inverter - Hitachi NES1-004SB Quick Reference Manual

Ne-s1 series
Table of Contents

6.4 Power up the inverter

(1) Power up the inverter after confirming the items shown in above section 6.2.
(2) Confirm the LED is emitting like shown below.
- Standard panel : Confirm that both PWR lamp and Key valid lamp are emitting
- Dedicated operator (NES1-OP) : Confirm that the 7-SEG LED is emitting. Display will be the one
set by b038 (Initial display selection). "0.00(output frequency monitor)" will be displayed under
default condition.
(3) Refer to section "6.5" and set required parameters. And then refer to section "6.6 Motor operation".
PWR lamp
Note 1) It will take around 1.5 seconds for the inverter to be ready(each LED emits). Please take into account this delay in case of
an application , which this delay will be important.
Key valid lamp
Run command
Standard panel
(This LED lights up
when the key operation is enabled.)
7-SEG LED
LED
6 - 3
Chapter 6 Operation
NES1-OP

Hide quick links:

Table of Contents
loading

Table of Contents