Relay Wiring Test; Relay Activation - Siemens HydroRanger 200 Instruction Manual

Table of Contents
P111–Control Functions
The control function energizes the relay coils. When the instrument is at rest (no controls
operating) the relay coils are de- energized.
P112–Relay ON Setpoint
Sets the process point at which the relay is tripped.
P113–Relay OFF Setpoint
Sets the process point at which the relay is reset.
P118–Relay Output Logic
Affects relay reaction. Reverses the logic (normally-open to normally-closed or vice
versa).
P129–Relay Failsafe
Changes how individual relays react to a failsafe condition on the instrument.

Relay Wiring Test

P119–Relay Logic Test
Checks the application wiring by forcing a relay control function, such as a level alarm or
pump control setpoint. Ensure all the relay programming and wiring works properly.
Please verify that ON and OFF respond correctly. Use P119 as a final test once all of the
relay programming is done.

Relay Activation

The flexibility of the relay functions ensures that the HydroRanger 200 can support relay
wiring for different systems and applications. Use the following as a guide to the most
common parameters.
Relay Setpoints and Functionality
[1 OR 3 relay model]: When a setpoint is reached, the corresponding action is taken. The
setpoint can be an ON or OFF setpoint related to a process variable.
[6 relay model]: The setpoint can be an ON or OFF setpoint related to a process variable,
or a timed setpoint based on interval and duration.
Page 42
HydroRanger 200 – INSTRUCTION MANUAL
7ML19985FC03

Hide quick links:

Table of Contents
loading

Table of Contents