Fujitsu SPARC Enterprise T5440 Site Planning Manual
Fujitsu SPARC Enterprise T5440 Site Planning Manual

Fujitsu SPARC Enterprise T5440 Site Planning Manual

Hide thumbs Also See for SPARC Enterprise T5440:

Quick Links

Table of Contents
loading

Summary of Contents for Fujitsu SPARC Enterprise T5440

  • Page 3: Sparc Enterprise T5440 Server

    SPARC Enterprise T5440 Server Site Planning Guide Manual Code C120-H029-02EN Part No. 875-4382-11 July 2009, Revision A...
  • Page 4 Fujitsu Limited or Sun Microsystems, Inc., or any affiliate of either of them.
  • Page 5 Aucune partie de ce produit, de ces technologies ou de ce document ne peut être reproduite sous quelque forme que ce soit, par quelque moyen que ce soit, sans l’autorisation écrite préalable de Fujitsu Limited et de Sun Microsystems, Inc., et de leurs éventuels bailleurs de licence.
  • Page 7: Table Of Contents

    Contents Preface vii SPARC Enterprise T5440 Site Planning Guide 1 Physical Specifications 2 Minimum Clearance for Service Access 2 Environmental Specifications 3 Power Source Requirements 4 Calculating Maximum Input Current 5 Acoustic Noise Emissions 5 Agency Compliance Specifications 6 Operating Environment Requirements 6...
  • Page 8 SPARC Enterprise T5440 Server Site Planning Guide • July 2009...
  • Page 9: Preface

    Read this manual thoroughly. Use the product according to the instructions and information available in this manual. Keep this manual handy for further reference. Fujitsu makes every effort to prevent users and bystanders from being injured or from suffering damage to their property. Use the product according to this manual.
  • Page 10: Related Documentation

    Integrated Lights Out Manager (ILOM) 2.0 Integrated Lights Out Manager How to use the ILOM 2.0 software on the C120-E513 2.0 Supplement for SPARC server Enterprise T5440 Server viii SPARC Enterprise T5440 Server Site Planning Guide • July 2009...
  • Page 11 Title Description Manual Code Integrated Lights Out Manager Information that describes ILOM 3.0 C120-E573 3.0 Concepts Guide features and functionality Integrated Lights Out Manager Information and procedures for network C120-E576 3.0 Getting Started Guide connection, logging in to ILOM 3.0 for the first time, and configuring a user account or a directory service Integrated Lights Out Manager...
  • Page 12 URL. For Users in U.S.A., Canada, and Mexico: (https://download.computers.us.fujitsu.com/) For Users in Other Countries: (http://www.fujitsu.com/global/contact/computing/sparce_index.ht SPARC Enterprise T5440 Server Site Planning Guide • July 2009...
  • Page 13: Sparc Enterprise T5440 Site Planning Guide

    This guide provides SPARC Enterprise™ T5440 server specifications and site requirements that you can use to plan and prepare your site. For safety and compliance information, refer to the SPARC Enterprise T5440 Server Safety and Compliance Guide and the documentation that came with your server.
  • Page 14: Physical Specifications

    Clearance, front of system 36 in. (91 cm) Clearance, rear of system 36 in. (91 cm) Related Information SPARC Enterprise T5440 Server Installation Guide ■ SPARC Enterprise T5440 Server Service Manual ■ SPARC Enterprise T5440 Server Site Planning Guide • July 2009...
  • Page 15: Environmental Specifications

    Environmental Specifications Environmental Specifications for the SPARC Enterprise T5440 Server TABLE: Specification Operating Nonoperating Temperature • Sea level to 2953 ft. (900m): 41°F to 95°F (5°C to 35°C) -40°F to 149°F (-40°C to 65°C) • Above 2953 ft. (900m): Decrease the maximum allowable IEC 60068-2-1 Test Ab and 60068-2-2 temperature by 1.6°F/1000 ft...
  • Page 16: Power Source Requirements

    Power Source Requirements The SPARC Enterprise T5440 server has four autoranging power supplies. To ensure redundant operation of the power supplies, connect the power cords to at least two separate AC circuits. Use the specifications in TABLE: SPARC Enterprise T5440 Power Specifications on page 4 only as a planning guide.
  • Page 17: Calculating Maximum Input Current

    Related Information “Power Source Requirements” on page 4 ■ Acoustic Noise Emissions Declared noise emissions for the SPARC Enterprise T5440 server is in accordance with ISO 9296 standards. See TABLE: SPARC Enterprise T5440 Noise Emissions on page SPARC Enterprise T5440 Noise Emissions...
  • Page 18: Agency Compliance Specifications

    Agency Compliance Specifications Refer to the SPARC Enterprise T5440 Server Safety and Compliance Guide for a full list of agency compliance specifications. Operating Environment Requirements Your environmental control system must provide intake air for the server that complies with the limits specified in “Environmental Specifications”...
  • Page 19: Ambient Temperature

    Note – The combination of inlet and exhaust restrictions such as cabinet doors, and the spacing of the server from the doors can affect the cooling performance of the server. You must evaluate the effect of these criteria. SPARC Enterprise T5440 Site Planning Guide...
  • Page 20 Take care to prevent recirculation of exhaust air within a rack or cabinet. ■ Manage cables to minimize interfering with the server exhaust vent. ■ SPARC Enterprise T5440 Server Site Planning Guide • July 2009...
  • Page 21: Index

    Index acoustic noise emissions, 5 agency compliance specifications, 6 airflow considerations, 7 airflow requirements, 7 electrical power best practices, 6 environmental specifications, 3 humidity, ambient relative, 7 installation site requirements, 1 operating environment requirements, 6 power source requirements, 4 service access clearance, minimum, 2 temperature, ambient, 7 ventilation requirements, 7...
  • Page 22 SPARC Enterprise T5440 Server Site Planning Guide • July 2009...

Table of Contents