5
|
Application guidelines

5.5.4 Preferential kWh rate power supply

Installer reference guide
48
Exception
You can use a second power meter if:
-
The power range of one meter is insufficient.
-
The electrical meter cannot easily be installed in the electrical cabinet.
-
230 V and 400 V three-phase grids are combined (very uncommon), because of
technical limitations of power meters.
Connection and setup:
-
Connect the second power meter to X5M/3 and X5M/4. See
electricity
meters" [
-
In the software the power consumption data of both meters is added so you do
NOT have to set which meter covers which power consumption. You only need
to set the number of pulses of each power meter.
See
"Preferential kWh rate power
meters.
General rule
Power meter 1: Measures the outdoor unit.
Power meter 2: Measures the rest (i.e. indoor unit and backup heater).
Setup
Connect power meter 1 to X5M/5 and X5M/6.
Connect power meter 2 to X5M/3 and X5M/4.
See
"To connect the electricity
Power meter types
Power meter  1: Single- or three-phase power meter according to the power
supply of the outdoor unit.
Power meter 2:
-
In case of a single-phase backup heater configuration, use a single-phase
power meter.
-
In other cases, use a three-phase power meter.
Example
Single-phase outdoor unit with a three-phase backup heater:
0
0
58 0
1 5 0
a
c
e
e
f
g
h
i
A
B
A Outdoor unit
B Indoor unit
C DHW tank
4
 106].
4
supply" [
4
meters" [
 106].
0
0
58 0
1 5 0
b
d
  
 
"To connect the
 48] for an example with two power
EPRA14~18DAV3+W1 + ETVH/X16S18+23DA6V+9W(G)
Daikin Altherma 3 H HT F
4P587502-1B – 2020.12
Table of Contents
loading

Table of Contents