Installation; Engine Start Control Connections - GE Zenith Controls MX150 Operation And Maintenance Manual

Microprocessor controller transfer switch control panel
Table of Contents

Installation

Turn OFF all power before installation, adjustment, or removal of transfer switch or any of its components.
E
Figure 3
Engine Start
Control Connections
The engine-start terminals are clearly identified by a
label on the microcontroller backplate. In the case of
manual transfer switches, or in other applications not
requiring the microprocessor, clearly marked terminal
blocks are provided in the upper left corner of the con-
trol panel for the engine start control wires.
Terminals for field connections to the A3 Emergency
auxiliary contacts and the A4 Normal auxiliary contacts
are also provided. These terminals are clearly marked
and appear on the side of the power panel. On 400
amp metal frame units these terminals appear on the
bracket above the operator handle.
Initial Energization
Before proceeding, refer to the information package
supplied with the ATS and read and understand the
information on all accessories provided.
1.
Unlock the enclosure.
2.
Open the enclosure.
3.
Verify the correct system voltage.
: The equipment rating nameplate on
NOTE
the transfer switch lists the voltage.
See Figure 3 .
4.
Close Source 1 circuit. breaker.
NOTE
:The controller will illuminate Source 1
Available
LED
if proper voltage
is sensed.
5.
Verify the phase to phase voltages at the Normal
line terminals.
6.
Close the Emergency source circuit breaker.
7.
Start the generator's engine.
4
MX150 Operation and Maintenance Manual (70
(cont'd)
DANGER
HAZARDOUS VOLTAGE
(Can Cause Severe Injury or Death)
4
1
5
2
(Engine Start)
6
3
P Relay
Contact rating is
10 Ampere at 120VAC
or 28VDC Gold plated
:
The controller will illuminate Source 2
NOTE
Available
and frequency levels are reached.
8.
Verify the phase to phase voltages at Source 1
line terminals.
9.
Verify that the phase rotation of Source 1
is the same as the phase rotation of
Source 2.
10. Shut down the generator's engine.
11. Place the starting control in the Automatic position.
12. Complete the visual inspection of the transfer switch.
13. Close the enclosure.
14. Lock the enclosure.
g
GE Zenith Controls
SERIAL NUMBER:
VOLTS -
RATING:
AMPS -
SYSTEM VOLTS:
MODEL NUMBER:
Figure 4
CAUTIONS
Certain accessories, per specific
schematics, can inhibit automatic transfer.
Engine Gen-Set could start when
engine control wires are attached.
R
-2000)
when preset voltage
LED
HZ -
PHASE -
GE Zenith Controls
Table of Contents
loading

Table of Contents