System Maintenance; Preliminary Checks - GE LOGIQ P6 Service Manual

Hide thumbs Also See for LOGIQ P6:
Table of Contents
GE H
EALTHCARE
D
5245279, R
IRECTION
EVISION
Section 10-5

System Maintenance

10-5-1

Preliminary Checks

The preliminary checks take about 15 minutes to perform. refer to the system user documentation
whenever necessary.
Table 10-6
Step
1
2
3
4
5
6
3
System Checks
Item
Ask & Listen
Ask the customer if they have any problems or questions about the equipment.
Fill in the top of the Ultrasound Inspection Certificate (see page 29). Note all probes and system
Paperwork
options.
Turn the system power on and verify that all fans and peripherals turn on. Watch the displays during
Power up
power up to verify that no warning or error messages are displayed.
Probes
Verify that the system properly recognizes all probes.
Displays
Verify proper display on the monitor and touch panel.
Presets
Backup all customer presets on an CD-RW.
Section 10-3 - Maintenance Task Schedule
LOGIQ™ P6/P6 P
Description
S
M
RO
ERVICE
ANUAL
10 - 7
Table of Contents
loading

Table of Contents