Figure 7.25 Return Sensors - Cutting Wire Ties; Figure 7.26 Dataline - Probe Calibration - Carrier TRANSICOLD PrimeLINE 69NT40-571-001 Operation And Service Manual

Container refrigeration units
Table of Contents
4. Cut all the wire ties (see
GDP Calibration, Perform Calibration:
1. Connect the interrogator cable to the interrogator port. Then, power on the unit.
Before powering on the unit, it is important to ensure that all dismantling work is done and
tools are away and service personnel are not working on the unit at the time of power on.
2. Open DataLINE version 3.1 or above. From the DataLINE launch pad, click on the Probe Calibration button
Figure
7.26) to go to the Probe Calibration screen. A pop-up window will appear reminding the user to
(see
ensure proper ice bath temperature. Click OK to acknowledge.
T-372
Figure
7.25) that are securing the sensors to the harness and remove sensor.

Figure 7.25 Return Sensors - Cutting Wire Ties

WARNING
!

Figure 7.26 DataLINE - Probe Calibration

7–40

Hide quick links:

Table of Contents
loading

Table of Contents