Emerson VERTIV Liebert Mini-Mate2 Series User Manual page 80

Table of Contents
2 INSTALLATION
Read this entire installation section before starting installation. This section details dimensional, electrical
and piping information and specifications that affect the placement of the PFH unit in relation the
connected evaporator unit, other outside units, barriers and walls.
Be particularly mindful of service and airflow clearances and maximum equivalent piping distances and in
elevation differences between PFH and connected evaporator unit. Consult and confirm applications with
your Vertiv representative when applications exceed any of these specifications.
2.1 Equipment Inspection
When the unit arrives, inspect all items for any visible or concealed damage. Report any damage to the
carrier immediately and file a damage claim; send a copy of the claim to Vertiv or your local Vertiv sales
representative.
If possible, maintain equipment and packaging until it is at the installation location.
2.2 Location Considerations
To ensure an adequate air supply, locate all condensing units in a clean-air area, away from loose dirt and
debris that can clog the coil. Avoid ground-level sites with public access or areas that are exposed to
heavy snow accumulation. Locate unit to allow maximum security and maintenance accessibility.
Do not locate condensing units near steam, hot air or fume exhausts. Do locate units at least 18 in.
(457mm) from walls, obstructions or adjacent units. For multiple unit installations, space unit so that the
hot condenser exhaust air is not directed toward the condenser air inlet of an adjacent unit.
Install a solid base at least 2 in. (51mm) higher than the surrounding grade and 2 in. (51mm) larger than
condensing unit base dimensions and capable of supporting the condenser's weight.
Vertiv | Liebert PFH Installer/User Guide |
3
Table of Contents

Troubleshooting

loading

Table of Contents