Assembling The Cable Connector; Checking Cabinet Installation; Checking Installation Environment - Huawei OptiX RTN 905 Quick Installation Manual

Radio transmission system v100
Table of Contents

Assembling the Cable Connector

1

Checking Cabinet Installation

No.
1
The layout of the cabinet complies with the engineering designs.
In pole-mounting mode, the mounting brackets are fixed securely, and the frame is fixed properly
and is not distorted.
2
In wall-mounting mode, the holes for the frame are in proper contact with the holes for the
3
expansion bolt, and the frame and the wall surface are in proper horizontal contact.
4
In wall-mounting mode, the cabinet is installed securely and does not swing when you shake it.
The waterproof cover of the bottom port and the hang chains are bound with the surrounding
5
cables.
6
The surface of the overall equipment is clean and tidy. The exterior paint is intact.
7
The door and lock of the cabinet are proper.
8
All labels, tags, and nameplates are correct, legible, and complete.
2

Checking Installation Environment

No.
1
No fingerprints or other smears exist on the exterior of the equipment cabinet.
2
No excessive adhesive tapes or cable ties exist on the cables.
3
No tapes, cable ties, wastepaper, or packing bags are left around the equipment cabinet.
4
All the items around the equipment are neat, clean, and intact.
What to Check For
What to Check For
20
Table of Contents
loading

Need Assistance?

Do you have a question about the OptiX RTN 905 that isn't answered in the manual? Leave your question here.

Error while submitting your question. Please, reload page and try again.

Thank you! Your question has been received!

Table of Contents