Huawei PDC V2.0 Quick Manual
Huawei PDC V2.0 Quick Manual

Huawei PDC V2.0 Quick Manual

Pdu8000 modular precision

Quick Links

PDU8000 Modular Precision
PDC V2.0
Quick Guide
Issue: 03
Part Number: 31508339
Date: 2018-01-25
HUAWEI TECHNOLOGIES CO., LTD.
loading

Summary of Contents for Huawei PDC V2.0

  • Page 1 PDU8000 Modular Precision PDC V2.0 Quick Guide Issue: 03 Part Number: 31508339 Date: 2018-01-25 HUAWEI TECHNOLOGIES CO., LTD.
  • Page 2 (8) Monitoring board 4 of route I (10) Output circuit breaker of route II (11) Monitoring board 2 (12) Monitoring board 5 (13) Monitoring board 3 (14) Monitoring board 6 Copyright © Huawei Technologies Co., Ltd. 2018 All rights reserved.
  • Page 3 Monitor Display Unit (MDU) Indicator Meaning Status A critical alarm has been Indicator generated, and the buzzer is sounding constantly. Yellow A major alarm has been generated, and the buzzer is sounding at intervals of 0.5s. Green A warning has been generated, or the precision PDC is running properly.
  • Page 4 3. Only engineers certified by the manufacturer or its agents are allowed to perform PDC installation, commissioning, and maintenance. Otherwise, personal injury or equipment damage may occur, and Huawei will not be liable for any loss. 4. Sections and steps marked as optional in this document can be performed selectively based on the actual configuration.
  • Page 5 3. Secure the PDC. Scenario 1 Scenario 2 NOTE (Optional) When the PDC installation environment is 5# channel steel and that the PDC cannot be secured using the mounting holes, secure the PDC using the mechanical part shown in the following figure.
  • Page 6: Installing Cables

    Installing Cables NOTE This document uses the dual-input top cable routing and single-input bottom cable routing as examples. Cable connections for other scenarios are similar. NOTICE 1. Ensure that all circuit breakers, including upstream output circuit breakers, are switched to OFF before connecting cables.
  • Page 7 4. Connect the input power cables. 5. Connect the output power cables. NOTICE Connect the three-phase cables, N cable, and PE cable in turn. 7. Connect the PDC monitoring cable to the RS485_1 or FE port on the MDU side panel. 6.
  • Page 8 Connecting Cables (Bottom Cable Routing) 1. Remove the rodent-proof meshes at the bottom and put them aside. 2. Remove the transparent covers of the N bar 3. Connect cabinet ground cables. and input copper bar, and put the covers aside. 4.
  • Page 9 6. The following figure shows the overall effect 7. Connect the PDC monitoring cable to the after cable connection. RS485_1 or FE port on the MDU side panel. (1) Monitoring cable outlet 8. (Optional) Connect the fire linkage cable by referring to Appendix B.
  • Page 10 Check Before Power-on Commissioning Hardware installation checklist Check Item Result The cabinet is clean and free of foreign matters such as screws and □Yes □No copper wires. □Yes □No The paint on the cabinet exterior is intact. □Yes □No The cabinet door and lock work properly. □Yes □No All safety warning labels are correct, clear, and complete.
  • Page 11: Power-On Commissioning

    Power-On Commissioning NOTICE 1. The power-on commissioning personnel must be at least two qualified electricians. One performs operations while the other monitors the operations. Irrelevant persons should be warned off. 2. User types are classified into admin and operator. User admin has higher operation rights than user operator.
  • Page 12 After the MDU screen starts, log in to the system as the admin or operator user (the preset password is 000001 for both types of users), and perform the following operations by referring to the figures: • If this is the initial startup, set the language, time, date, network parameters, and system parameters by using the Setting Wizard.
  • Page 13 Appendix Power Cable Specifications YJV 5-core cables are recommended. When the ambient temperature is 40º C, the conductor working temperature cannot exceed 90º C. For the installation torque for power connection of involved electrical parts, see the specifications of the electrical parts. If the torque is not specified, see the torque requirements listed in the following table.
  • Page 14 Connecting the fire linkage cables Scenario 1: single-input or dual-input PDC; one pair of fire extinguishing input cables control all loads to power off. Single-input PDC: Connect the positive and negative terminals of the fire control cable to the 24VDC(+) and 24VDC(-) wiring terminals at the rear right of the cabinet respectively. Dual-input PDC: Connect the positive and negative terminals of the fire control cable to the 24VDC(+) and 24VDC(-) wiring terminals at the rear left or rear right of the cabinet respectively.
  • Page 15 Google Play Huawei App Store Scan here for more documents: Support-E Support WeChat You can also log in to Huawei technical support website: http://support.huawei.com/enterprise http://support.huawei.com Huawei Technologies Co., Ltd. Huawei Industrial Base, Bantian, Longgang Shenzhen 518129 People's Republic of China...