Introduction; Purpose And Scope - Honeywell TotalPlant LCN System Installation

Table of Contents
1

INTRODUCTION

Section 1
This section lists all support documents and special tools/test equipment required during
TotalPlant
Solution (TPS) LCN System equipment installation.

1.1 PURPOSE AND SCOPE

The LCN System Installation manual provides instructions for installing TPS LCN System
equipment cabinets, Universal Stations, Universal Station X , RULA station, Application
Module X , Scanner Application Module, and Universal Work Stations at the customer site.
This manual, along with the TPS equipment installation publications, listed below, are
required during the initial system installation and for modifying or expanding a TPS system
that is already installed. The installation procedures assume that all intracabinet/console
cabling and wiring have been made at the factory before the equipment is shipped.
The installation manual includes general instructions on how to move and position the
system equipment, how to connect the power and grounding cables to the equipment, and
how to install the Local Control Network (LCN) and Data Hiway (DH) cables that link the
functional modules to the system. A successful power-up check concludes the installation
phase and signals the beginning of the system-checkout phase.
Included in this publication is the cabling information needed to install cables to equipment
located outside the console and cabinets.
LCN System Installation
1-1
9/96