3.5.

General recommendations

If you experience difficulties in setting up this product, contact GEW at the address given at the
front of this manual. If in doubt, ask! We are always ready to help.

3.5.1. Installation

e-Brick systems should be installed by GEW service technicians or, alternatively, by GEW
factory trained personnel. To validate the system warranty, a system specific code must be
entered on completion of installation and commissioning. When a system has not been
commissioned by GEW, a message will appear on the HMI every 20 hours reminding the
customer that the system is not under warranty:
"SYSTEM NOT UNDER WARRANTY. PLEASE CONTACT GEW, TEL: +44 (0)1737 824510"
To validate the warranty, enter the password supplied by GEW service.

3.5.2. Modifications

Each GEW UV system is engineered to meet the requirements of a given installation. Any
change in requirements may require re-commissioning or modification of the system; always
refer to GEW for advice before attempting to modify the UV system.

3.5.3. Markings and tamper evident seals

GEW products are clearly marked with safety warnings to draw attention to specific hazards.
Due to the hazardous voltages within the e-Brick, security screws are used to secure the
housing; in addition, tamper evident seals (see Figure 6) are fitted to indicate that covers
have been removed. If these seals are broken or damaged the GEW warranty will be void.

3.5.4. Location of equipment

The user should ensure that no electrical controls are obstructed. Always site equipment to
allow reasonable access for servicing.
The installer should ensure that clearances around the equipment fall within the safety
regulations for use of electrical equipment. Impact from vehicles such as forklift trucks must
be prevented, typically by installing a protective crash barrier. This is the responsibility of the
customer.
Loose cables between distribution panels, the printing machine and the UV dryers must be
protected by galvanized trunking. This is the responsibility of the customer.
GEW UV e-Brick installation and operating manual

Figure 6: Tamper evident seal

17 of 49
Table of Contents
loading

Related Products for GEW e-Brick 9kW

This manual is also suitable for:

E-brick 12kwE-brick 22kw

Table of Contents