Yamaha F200B Service Manual page 271

Hide thumbs Also See for F200B:
Table of Contents
5. Install the cover 7 and aprons 8.
7
8
TIP:
Make sure that the ground lead a is routed
through the gap between the aprons and is
not pinched.
6. Connect the PTT relay terminals b, and
then tighten the PTT relay terminal bolts
9 to the specified torque.
STBD
b
9
PTT relay terminal bolt 9:
4 N·m (0.4 kgf·m, 3.0 ft·lb)
7. Install the caps 0, and then fasten the
PTT motor lead c using the plastic tie A
and holders B.
0
8
TIP:
To fasten the PTT motor lead, see "Wiring
a
harness routing" (5-6).
8. Connect the cooling water hose C, and
9. Fasten the cooling water hose C using
10. Connect the neutral switch coupler d,
11. Connect the shift cut switch coupler e.
12. Fasten the neutral switch lead and wiring
13. Install a new O-ring and the dipstick
b
J
e
14. Install the intake manifold (STBD). See
Power unit assembly
0
c
then fasten it using the clamp D.
the holder E.
and then install the neutral switch coupler
to the bracket F.
harness using the holder G and H.
guide I, and then install the dipstick J.
d
F
E C D
"Installing the intake manifold" (6-18).
B
A
B
7
I
H
G
7-12
Table of Contents
loading

This manual is also suitable for:

Fl200bF250gFl250g

Table of Contents