Default Message Sequence - GE PQMII Instruction Manual

Power quality meter
Table of Contents
CHAPTER 3: OPERATION
3.4.4

Default Message Sequence

PQMII POWER QUALITY METER – INSTRUCTION MANUAL
ENTER
RESET
THREE PHASE REAL
POWER =
1000 kW
ACTUAL VALUE OR SETPOINT
TO BE REMOVED FROM THE
DEFAULT MESSAGE QUEUE
Each PQMII is pre-programmed with five default messages as shown below. Note, each
time the factory setpoints are reloaded the user programmed default messages are
overwritten with these messages.
The PQMII will scroll through the default messages in the sequence shown.
A=
100
C=
100
Van = 120
Vcn = 120
FREQUENCY = 60.00 Hz
TIME:
12:00:00am
DATE:
JAN 01 1996
Phone: 905-294-6222
www.GEmultilin.com
RESET
VALID DEFAULT
MESSAGE
TO DELETE THIS
MESSAGE PRESS ENTER
DISPLAYED FOR 3 SECONDS
WHEN ENTER KEY AND RESET
KEY ARE PRESSED IN SEQUENCE
NOT A DEFAULT
MESSAGE
NOT A SELECTED
DEFAULT MESSAGE
DISPLAYED FOR 3 SECONDS WHEN
ENTER KEY AND RESET KEY ARE
PRESSED IN SEQUENCE
B=
100
Location: A1 METERING
AMPS
Vbn = 120
Location: A1 METERING
V
Location: A1 METERING
Location: A2 STATUS
Location: A2 STATUS
ENTER
STORE
DEFAULT MESSAGE
REMOVED
DISPLAYED FOR 3 SECONDS
WHEN THE ENTER KEY IS
PRESSED
REDEFMSG.CDR
ð
CURRENT
ðò
VOLTAGE
ðò
FREQUENCY
ðò
CLOCK
ðò
PROGRAMMABLE MESSAGE
3–9

Hide quick links:

Table of Contents
loading

This manual is also suitable for:

Pqm ii

Table of Contents