Installation - LG AVNH-EL Service Manual

Universal system air conditioner
Table of Contents

8. Installation

• Please read this instruction sheet completely before installing the product.
• When the power cord is damaged, replacement work shall be performed by authorized personnel only.
• Installation work must be performed in accordance with the national wiring standards by authorized personnel only.
Installation Parts Provided
Installation Plate (VB, 2pcs)
-1 Installation Plate (VE, 1pc)
Washer Bolt (M8 L25, 4pcs, type "A")
Floor Mount Bracket (1pcs)
Drain Hose, Insulated
Drain Hose Hanger and screw
The other Installation Parts Needed
Suspension Bolt
Bolts for Mount Bracket
Connecting Tube(mm)
• Gas side : Ø12.7, Ø15.88
• Liquid side : Ø6.35
Connecting Cable
Drain Hose Extended
Required Parts
• Installation Plate
• Four Type "A" screws
• Connecting cable
• Pipes: Gas side ..........Ø9.52, Ø12.7, Ø15.88mm
Liquid side.............................................Ø6.35mm
• Insulated drain hose
• Insulation materials
• Two type "B" screws
6
1 -1
5
(Floor Mounting)
Required Tools
• Level
• Screw driver
• Electric drill
• Hole core drill (ø70mm)
• Flaring Tools set
• Specified Torque Wrenches
1.8kg·m...........................Liquid side piping
5.5kg·m .............................Gas side piping
Spanner .....................................Half union
• Specified Torque Wrenches
1.8kg·m...........................Liquid side piping
5.5kg·m..............................Gas side piping
• Hexagonal Wrench (4mm)
• Gas-leak Detector
• Owner's Manual
• Thermometer
(Ceiling/Wall Mounting)
3
7
Service Manual 49
Ceiling & Floor
1
2
4

Hide quick links:

Table of Contents
loading

Table of Contents