Internal Connections; External Connections; Connecting The Water Piping; Connecting The Water Piping Of The Gas Boiler - Daikin EHYKOMB33AA Installation And Operation Manual

Hybrid heat pump – gas boiler
Hide thumbs Also See for EHYKOMB33AA:
Table of Contents
7.3.1
Internal connections
If  possible,  the  condensate  drain  pipe  should  be  routed  and
terminated so that the condensate drains away from the boiler under
gravity  to  a  suitable  internal  foul  water  discharge  point  such  as  an
internal soil and vent stack. A suitable permanent connection to the
foul waste pipe should be used.
b
a
Ø22 mm
a
Condensate discharge from boiler
b
Soil and vent stack
c
Minimum 450 mm and up to 3 storeys
If  the  first  option  is  NOT  possible,  an  internal  kitchen  or  bathroom
waste pipe, washing machine pipe can be used. Make sure that the
condensate drain pipe is connected downstream of the waste trap.
a
b
100 mm
c
Ø22 mm
≥75 mm
d
a
Condensate discharge from boiler
b
Soil and vent stack
c
Sink or basin with integrate overflow
d
75 mm waste trap and air break
Condensate pump
Where gravity discharge to an internal termination is NOT physically
possible or where very long internal runs of drainage pipe would be
required  to  reach  a  suitable  discharge  point,  condensate  should  be
removed by using a proprietary condensate pump (field supply).
The  pump  outlet  pipe  should  discharge  to  a  suitable  internal  foul
water  discharge  point  such  as  an  internal  soil  and  vent  stack,
internal  kitchen,  bathroom  waste  pipe,  or  washing  machine  waste
pipe. A suitable permanent connection to the foul waste pipe should
be used.
EHYKOMB33AA
Daikin Altherma hybrid heat pump – gas boiler module
4P353067­1A – 2013.10
c
a
Ø22 mm
e
a
Condensate discharge from boiler
b
Soil and vent stack
c
Sink or basin with integrated overflow
d
75 mm waste trap and air break
e
Condensate pump
7.3.2
External connections
If  an  externally  condensate  drainage  pipe  is  used,  following
measures should be made to prevent freezing:
▪ The pipe should be run internally as far as possible before going
to  the  outside.  The  pipe  diameter  should  be  increased  to  a
minimum  inner  diameter  of  30  mm  (typically  outer  diameter  of
32 mm) before it goes through the wall.
▪ The  external  run  should  be  kept  as  short  as  possible,  taking  the
most  vertical  route  possible  to  the  discharge  point.  Take  into
account that there are no horizontal section in which condensate
might collect.
▪ The external pipe should be insulated. Use a suitable waterproof
and weather proof insulation ("Class O" pipe insulation is suitable
for this purpose).
▪ The use of fittings and elbows should be kept to a minimum. Any
internal burrs should be removed so that the internal pipe section
is as smooth as possible.
7.4
Connecting the water piping
7.4.1
Connecting the water piping of the gas
boiler
To connect the water piping for domestic hot
water
1 Flush the installation thoroughly to clean.
a
b
a
Domestic hot water outlet
b
Cold water inlet
c
Pressure relief valve (field supply)
2 Install a pressure relief valve.
3 Connect the hot water connection (Ø15 mm).
7 Installation
b
c
≥75 mm
d
c
Installation and operation manual
13